Chapter 3
63
External Module Disassembly Process
External Modules Disassembly Flowchart
The flowchart below gives you a graphic representation on the entire disassembly sequence and instructs you
on the components that need to be removed during servicing. For example, if you want to remove the main
board, you must first remove the keyboard, then disassemble the inside assembly frame in that order.
Screw List
Item
Screw
Color
Part No.
C
M3 x L4
Silver
86.9A554.4R0
F
M2 x L4
Black
86.00F24.724
EXTERNAL MODULE DISASSEMBLY
WLAN
BOARD
TURN OFF POWER
AND PERIPHERALS
UNPLUG POWER
CABLES
Fx2
LOWER
COVER
Captive Screwx3
DIMM
MODULES
Cx4
HDD
MODULE
HARD DISK
BRACKET
HARD DISK
DRIVE
REMOVE BATTERY
PACK
SD DUMMY CARD
ExpressCard
DUMMY CARD
Fx1
Содержание Ferrari 1200
Страница 6: ...VI ...
Страница 10: ...X ...
Страница 18: ...8 Chapter 1 7 Modem RJ 11 port Connects to a phone line Icon Item Description ...
Страница 40: ...30 Chapter 1 Start Windows Mobility Center from the Accessories program group in the Start menu ...
Страница 52: ...42 Chapter 1 ...
Страница 69: ...Chapter 2 59 ...
Страница 70: ...60 Chapter 2 ...
Страница 92: ...82 Chapter 3 13 Disconnect the fingerprint cable from the button board ...
Страница 132: ...122 Chapter 4 F5h Boot to Mini DOS F6h Clear Huge Segment F7h Boot to Full DOS Code Beeps ...
Страница 139: ...Chapter 4 129 ...
Страница 140: ...130 Chapter 4 ...
Страница 141: ...Chapter 5 131 Top and Bottom View Jumper and Connector Locations Chapter 5 ...
Страница 146: ...136 Chapter 6 Ferrari 1200 Exploded Diagram ...
Страница 157: ...Chapter 6 147 ...
Страница 158: ...Appendix A 148 Ferrari 1200 Series Model Definition and Configuration Appendix A ...
Страница 162: ...152 Appendix B ...
Страница 164: ...154 Appendix C ...