Acer EI342CKR
11
4.2 Assembly Procedures
Preparation before assemble:
1.Clean the room for work
2.Identify the area for material
3.Prepare the implement, equipment, materials as bellow
:
1) working table
2) Screw-driver
3) Knife
4) glove
5) cleaning cloth
ESD protection
S1
Assembly preparation and MB/Power BD processing
Take a LCM module, then insert the LVDS cable and adhesive the
conductive foam on the MB, and cable assemble with power BD
S2
Assemble the MB & Power BD BKT, terminal
BKT and then assemble the MB & Power BD
Assemble the MB & power BD BKT and terminal BKT, then fix them
with screw; also assemble the MB and power BD with the screw.
Содержание EI342CKR
Страница 1: ...ACER_LCD_EI342CKR_SM20220108V1 Acer Monitor EI342CKR LIFECYCLE EXTENSION GUIDE...
Страница 2: ......
Страница 5: ...Acer EI342CKR 4 Exploded Diagram 1 1 Product Exploded Diagram...
Страница 6: ...Acer EI342CKR 5 1 Wiring connectivity diagram...
Страница 15: ...Acer EI342CKR 15 4 Troubleshooting...