![background image](http://html1.mh-extra.com/html/acer/ei242qr/ei242qr_lifecycle-extension-manual_4223986011.webp)
ACER EI242QR
11
4.2 Assembly Procedures
Preparation before assemble:
1.Clean the room for work
2.Identify the area for material
3.Prepare the implement, equipment, materials as bellow
:
1) working table
2) Screw-driver
3) Knife
4) glove
5) cleaning cloth
ESD protection
S1
Assemble the lower trim part
Take a lower trim and stick the conductive cloth and PE foam
Then fix the lower trim part with screw.
S2
LVDS cable & panel power cable assemble
Insert the LVSD cable & panel power cable into the panel driver BD
connector , then use the tape and conductive cloth fix the cable as
picture shows .
S3
Adhesive the mylar on the MB bracket then fix it with chassis with
Содержание EI242QR
Страница 1: ...ACER_EI242QR_SM20211215V1 Acer Monitor EI242QR LIFECYCLE EXTENSION GUIDE...
Страница 2: ......
Страница 5: ...ACER EI242QR 5 Exploded Diagram 1 1 Product Exploded Diagram...
Страница 6: ...ACER EI242QR 6 1 Wiring connectivity diagram...
Страница 14: ...ACER EI242QR 14...
Страница 15: ...ACER EI242QR 15 4 Troubleshooting...