18
3. Install the ISP tool.
Note: If the F/W Upgrade use the same ISP tool as the EDID writing, you must close the EDID writing tool
before running the F/W Upgrade tool.
3.1 Copy the three file in one folder.
3.2 Double-click
to run the ISP tool.
3.3 Connect to the monitor. Click “Connect”. If the tool communicate with monitor successfully, the tool will detect the
flash type of monitor.
Содержание CB272U
Страница 1: ...1 27 LCD Monitor ACER CB272U Service Service Service Acer Monitor CB272U LIFECYCLE EXTENSION GUIDE ...
Страница 7: ...7 ...
Страница 10: ...10 Assemble the stand and base ASS Y S8 ...
Страница 11: ...11 4 2 Disassembly procedures Push the button to remove the stand ASS Y and unscrew the screw on rear cover S1 ...
Страница 14: ...14 Remove the screws to separate the panel and the Middle Frame DECO BEZEL and the LED board S5 ...
Страница 15: ...15 Take off the mylar Turn over the shield and unscrew the screws on main board and power board S6 ...
Страница 16: ...16 Remove the main board and power board Disconnect the cables S7 ...
Страница 21: ...21 ...
Страница 26: ...26 4 2 Select the EDID folder 4 3 Load EDID successful ...
Страница 33: ...33 6 Trouble shooting instructions ...