3-10
AcerAltos 21000 System Guide
7. Connect the heatsink cables to the main board. Refer to section
3.1.2 for the location of the thermal and fan connectors.
Refer to the VRM LED guide (section 3.1.5) for
installing VRMs. A VRM LED with green light indicates
that a VRM has to be installed in its socket.
3.1.4
Installing and Removing the Termination
Board
When you are not using all the Slot 2 sockets, you must install a
termination board into each empty slot.
Installing a Termination Board
Follow these steps to install the termination board:
1.
Position the termination board over the empty slot.
2. Carefully insert the golden fingers of the termination board into
the slot until the board fits completely.
3. Use the retention mechanism cover to secure the processor by
pressing it down until it locks.
OO
Содержание AcerAltos 21000
Страница 1: ... FHU OWRV System Guide ...
Страница 22: ...Getting Started 1 5 1 2 2 Connecting a Mouse ...
Страница 23: ...1 6 AcerAltos 21000 System Guide 1 2 3 Connecting a VGA Monitor ...
Страница 43: ...2 18 AcerAltos 21000 System Guide 3 Secure the drive with four screws 4 Insert the drive into the bay ...
Страница 61: ...2 36 AcerAltos 21000 System Guide 3 Secure the air guide with two screws 4 Reattached the left panel door ...
Страница 143: ...A 4 AcerAltos 21000 System Guide ...