Installation and Operation Manual
Appendix
C ATM OAM Functionality
ACE-3105, ACE-3205 Ver. 5.2
OAM Modes of Operation over ATM
C-7
Figure
C-16. VP Segment Point – Case F
Figure
C-17. VP Segment Point – Case G
VC Segment Point
When a VC connection point is set as a segment point, it operates as follows:
•
F5 end-to-end OAM cells are forwarded transparently to the other side of the
XC. F4 segment, F5 segment and end-to-end OAM cells are dropped from the
cell stream, while F5 segment AIS, RDI and CC cells are monitored.
Figure
C-18. VC Segment Point – Case A
Содержание ACE-3205
Страница 1: ...ACE 3105 ACE 3205 Cell Site Gateways Version 5 2 INSTALLATION AND OPERATION MANUAL The Access Company...
Страница 2: ......
Страница 352: ...Chapter 6 Monitoring and Diagnostics Installation and Operation Manual 6 114 Technical Support ACE 3105 ACE 3205 Ver 5 2...
Страница 380: ...Appendix D Clock Modes Installation and Operation Manual D 8 DSL and PSN Timing Modes ACE 3105 ACE 3205 Ver 5 2...
Страница 396: ...Appendix E Encapsulation over PSN Installation and Operation Manual E 16 5BClock Encapsulation ACE 3105 ACE 3205 Ver 5 2...
Страница 414: ......
Страница 416: ......
Страница 417: ......