Chapter
4 Configuration
Installation and Operation Manual
4-38
Configuring for Operation
ACE-3105, ACE-3205 Ver. 5.2
4.3
Configuring for Operation
This section describes in detail how to configure the parameters needed for
normal operation of the unit:
•
Configuring the Physical Layer Parameters
•
•
Configuring the Logical Layer Parameters
•
Configuring the Application Parameters
.
Configuring the Physical Layer Parameters
This stage consists of configuring the physical layer parameters of the Ethernet,
E1/T1 and SDH/SONET ports.
•
Depending on the hardware configuration you purchased, not all
functionalities listed and explained in this manual are actually available.
•
In some menus you are required to select the port number. In general, for
E1/T1/J1 ports the number can be 1 to 4/8/16 (1–4, 1–8 or 1–16, depending
on the number of ports in your unit).
³
To access the physical layer port options:
1.
From the Configuration menu (see
), select Physical Layer.
The Physical Layer menu is displayed.
ACE-3205 – RAD Data Communications
Configuration> Physical layer
1. Port
>
>
Please select item <1 to 1>
ESC-previous menu; !-main menu; &-exit
Figure
4-32. Physical Layer Menu
2.
From the Physical Layer menu, select Port.
The Port menu is displayed.
Note
Содержание ACE-3105
Страница 1: ...ACE 3105 ACE 3205 Cell Site Gateways Version 5 2 INSTALLATION AND OPERATION MANUAL The Access Company...
Страница 2: ......
Страница 352: ...Chapter 6 Monitoring and Diagnostics Installation and Operation Manual 6 114 Technical Support ACE 3105 ACE 3205 Ver 5 2...
Страница 380: ...Appendix D Clock Modes Installation and Operation Manual D 8 DSL and PSN Timing Modes ACE 3105 ACE 3205 Ver 5 2...
Страница 396: ...Appendix E Encapsulation over PSN Installation and Operation Manual E 16 5BClock Encapsulation ACE 3105 ACE 3205 Ver 5 2...
Страница 414: ......
Страница 416: ......
Страница 417: ......