background image

 

ACE088 

Page 7 of 21  

Rev Date: 9.21.2021

 

 

The second method is through the secure data deletion tool provided by the original 
manufacturer of the hard drive. This should be used in a scenario where the shell utility 
is not applicable. Each manufacturer should have the tool available on their website. If 
needed, please look on the hard drive label for the name of the manufacturer and 
model information.  

3(1)(o):   

List of recommended c

ombination

s of blade servers with chassis: N/A. 

 

 

3(1)(p):   

List of all current SKUs within this product family. 

SKUs 

PWKS_AA25UTRT 

PWKS_AA15PWTR 

Models 

PWKS1AA25UTRT 

PWKS1AA15PWTR 

PWKS2AA25UTRT 

PWKS2AA15PWTR 

PWKS4AA25UTRT 

 

 

3(3)(a):   

There is no use of cobalt in batteries in this product.  

The indicative weight range of neodymium in the HDD is 0.0 if manufactured by 
Western Digital, and is between 5-25 grams if manufactured by Seagate.  

3(3)(b):   

Please see the disassembly instructions on the next page. 

 

 

 

 

 

 

 

 

 

 

Содержание PWKS1AA15PWTR

Страница 1: ...PWKS1AA25UTRT PWKS2AA25UTRT PWKS4AA25UTRT PWKS1AA15PWTR and PWKS2AA15PWTR Servers User Manual Revision 1 0 Revision Date 9 21 2021...

Страница 2: ...nd found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the eq...

Страница 3: ...ning to EPEAT for the ACE Computers EPEAT registered servers Notes If you have any questions regarding this manual or server system please contact our support team through Ace Computers Support page h...

Страница 4: ...Memory 10 3 Processor 11 5 Motherboard 12 6 Expansion Card Graphics Card 13 7 Power Supply Module 14 8 Chassis Cover 15 9 Batteries 16 10 Riser Card 17 11 Fans 18 12 Back Plane 19 13 External Power Ca...

Страница 5: ...elow information conforms to requirements laid down in Annex II of the Commission Regulation 2019 424 3 1 a See Section 1 1 of the system manual for the product type 3 1 b See the title page and prefa...

Страница 6: ...is 331 9W 3 1 m The active state efficiency and performance is 26 0 3 1 n There are two methods by which a user can securely delete data from this system The user performing secure data deletion shou...

Страница 7: ...of the manufacturer and model information 3 1 o List of recommended combinations of blade servers with chassis N A 3 1 p List of all current SKUs within this product family SKUs PWKS_AA25UTRT PWKS_AA...

Страница 8: ...This Chapter also outlines specific substances mixtures and components that must be removed from any separately collected electronic waste component and shall be disposed or recovered in compliance wi...

Страница 9: ...nings HDD One 1 latch and four 6 Phillips screws SSD 1 Phillips screw Tools required Screwdriver with PH2 bit Procedure HDD Push the release button on the carrier Swing the handle fully Grasp the hand...

Страница 10: ...stenings Two 2 latches per memory module Tools required None Procedure Press both release tabs on the ends of the memory module to unlock it Once the module is loosened remove it from the memory slot...

Страница 11: ...of fastenings Four 4 T30 Torx screws Tools required Screwdriver with T30 Torx bit Procedure Remove the screws in the sequence of 4 then 3 then 2 then 1 as marked in the illustration below After removi...

Страница 12: ...nted circuit boards within the motherboard must be removed separately from the motherboard and shall be disposed or recovered in compliance with Directive 2008 98 EC A lithium battery resides on the m...

Страница 13: ...integrated should be removed prior to processing the riser card component Type and number of fastenings Six 6 Phillips screws Tools required Screwdriver with PH2 bit Procedure Remove the Phillips scr...

Страница 14: ...es depending on the configuration Type and number of fastenings One 1 latch per module Tools required None Procedure Unplug the power cord from the power supply Push the release tab on the back of the...

Страница 15: ...he server and it approximately 2 3 the size of the entire top as noted in the illustration below Type and number of fastenings Two 2 buttons Tools required None Procedure Hold down the two buttons sim...

Страница 16: ...hium battery resides on the motherboard The battery must be removed from separately from the motherboard and shall be disposed or recovered in compliance with Directive 2008 98 EC Removal instructions...

Страница 17: ...1 Phillips screw Tools required Screwdriver with PH2 bit Procedure Remove the screw and lift the riser card up from the motherboard expansion slot Selective Treatment Special Handling Per Annex VII D...

Страница 18: ...of fastenings One 1 fan header per fan Tools required None Procedure Disconnect the fan wiring from the fan header on the motherboard Then remove the fan from the fan tray Selective Treatment Special...

Страница 19: ...for PWKS_AA25UTRT series and PWKS_AA15PWTR series Tools required Screwdriver with PH2 bit Procedure Disconnect all cables Remove all Phillips screws to release and remove the backplane Selective Treat...

Страница 20: ...is fully configured the power supply cord would be connected to the power supply outlet located on the rear of the server chassis Note there are two power supplies per unit so be aware for two power s...

Страница 21: ...arts or product service for your system for self replacement or for on site replacement please visit https acecomputers com support and fill out the Ace Computers Support Request form If phone assista...

Отзывы: