ATTENTION: SEE PICTURE PAGE 1B: only with S1and R2 greenhouse types: The corner profile roof (profile G for R2 greenhouses, profiles J & K for S1
greenhouses) has a little hole (Ø3); that profile must be assembled so that this little hole is situated at the side of the ridge.
Stop Bolts
During the entire assembly
!10!
stop bolts are placed!!!
Si stop bolts
During the entire assembly
!2!
stop bolts are placed, for greenhouses with 7& 8 windows, there are
!3!
stop bolts provided. You
assemble 2 sidewalls.
You now have 2 façades and 2 sidewalls.
Slide the panels one into the other until the end, the stop bolts are immediately tightened firmly and definitively.
Roof
-
First install the ridge (profile C) on top of the 2 façades and fix it definitively with the stop bolts.
-
Greenhouses that are 7 & 8 windows long are provided with 2 glass rods (profile A) of each 2 stop bolts.
-
Place the glass rods (profiles A) between the sidewall and the ridge you just put in place (profile C) .
-
Assemble the traction strips (profiles B) to the ridge (profile C) in the corner and subsequently together with the glass rod (profile A) at the
sidewall.
ATTENTION 1 : the traction strips start from the façade in the ridge and go down to the gutter. (see detail pag drwing "ROOF".
ATTENTION 2:
If you bought a ridge decoration, mount it on the ridge profile
before
mouting the ridge profile itself.
Façade Supports
Only for greenhouses of types R3 , R4, S2 & S3.
The two façade supports are assembled between the façade and the ridge.
Supports
Only for greenhouses that are 7 & 8 windows long and R4 greenhouses.
Remove 2 glass rods from the sidewall having the same section as the glass rods of the roof in which the stop bolts are inserted. Place
two stop bolts per profile. Reinstall the glass rods, but use an M6x16 bolt at the bottom.
Install two gutter supports between the sidewall and the roof with the stop bolts provided.
Also install a support in the ridge of the roof using the stop bolts provided.
Assembly
Содержание S105H
Страница 2: ......
Страница 33: ......
Страница 35: ...3 GEVEL PIGNON 5 10 Wachtbouten 10 Boulons d attente 10 Stop Bolts 10 Warteschrauben 2 l GABLE GIEBEL ...
Страница 37: ...2 FRAME KADER CADRE 4 1a 1b RAHMEN 1a 1b 1a 1b 1a 1b 2 2 2 2 1a 1b ...
Страница 40: ...2 PREPARATION VOORBEREIDING PRÉPARATION 6 1 VORBEREITUNG 2 2 A B A B 2 2 2 ...
Страница 44: ...3 A L mm Qty Fig A 708 2 B 1852 2 4 DEUR PORTE 10 DOOR TÜR ...
Страница 45: ...2 DEUR PORTE 11 DOOR TÜR ...
Страница 47: ...l b a 2X 2 DEUR PORTE 13A DOOR TÜR ...
Страница 54: ...OPTION OPTIONEEL l RAAMOPENER OUVRE FENÊTRE 19 WINDOW OPENER FENSTERÖFFNER ...
Страница 55: ...8 6 4 3 7 RAAMOPENER 20 WINDOW OPENER 1 OUVRE FENÊTRE FENSTERÖFFNER ...
Страница 56: ...OPTION OPTIONEEL M4xl0 3 2 L mm 37 Qty Fig a û RAAMOPENER OUVRE FENÊTRE 21 WINDOW OPENER FENSTERÖFFNER ...
Страница 57: ...AFDEKPLAATJES PLAQUETTES DE FINITION 22 COVER PLATES AFDECKPLATEN ...
Страница 58: ...WDV28042022 ACD S105H ...