Recommended Electrical and Gas
Connection Locations
Installation requires penetrations into the cabinet for
high voltage electrical supply, low voltage controller
circuitry and for gas supply.
Gas supply connections are made through the
side of each unit in the factory-provided openings.
Penetrations for electrical connections are to be made
in the field as job conditions may require. High voltage
supply wiring and low voltage controller circuitry
access may be made either through the side of the
unit or through the bottom. See illustrations below.
Recommended side access.
Recommended locations for access through the base
of the cabinet are as shown.
Furnace 1
Gas Input
Furnace 2
Gas Input
Electric Heater Power Input Connection
Access Side
Control Center Door
HIGH
VOLTS
LOW
VOLTS
Electrical Input
Access Side
Discharge Air Temperature Sensor
All units are supplied with a Discharge Air Temperature
Sensor that is to be field-installed prior to unit start-
up. The sensor is to be installed at least three duct
diameters downstream of the
heat exchanger, or where good
mixed average temperature
occurs. The sensor must be
connected directly to the DDC
controller. All other sensors
and low voltage devices are
to be connected to the low
voltage terminal strip in the
control center. The discharge
air temperature sensor is
shipped loose and can be
found in the unit’s control
center. See the unit-specific
wiring diagram for connection
locations.
Typical Discharge Air
Temperature Sensor
WARNING
Do not make penetrations in the roof of the unit for
any reason. High voltage wiring is located between
the inner and outer shells of the roof. Damage to the
roof wiring circuitry could result in serious bodily
harm.
Electrical Input
Base Access
Electric Heater
Power Input Connection
Base Access
10
Model MPX Make-Up Air Unit
Model XMPX Make-Up Air Unit