![Accu-Flo Meter Service Veeder-Root Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/accu-flo-meter-service/veeder-root/veeder-root_installation-manual_456014005.webp)
1
Introduction
This manual tells you how to install the Veeder-Root Groundwater Sensor, Part No. 794380-62X. The
manual assumes all preliminary site preparation is completed, and that field wiring from the monitor to
the sensor junction box is in place.
For new installations, or if site preparation is necessary, refer to the appropriate Veeder-Root Site
Preparation and Installation Instructions or contact your Veeder-Root representative for assistance.
Related Manuals
You must reference the appropriate manual below, to plan and install wiring that will connect the
sensor to the console:
576013-879
TLS-300/TLS-350 Series Site Prep and Installation Guide
576013-773
ILS-350 Site Prep & Installation
Contractor Certification Requirements
Veeder-Root requires the following minimum training certifications for contractors who will install and
setup the equipment discussed in this manual:
Level 1
Contractors holding valid Level 1 Certification are approved to perform wiring and
conduit routing, equipment mounting, probe and sensor installation, tank and line
preparation, and line leak detector installation.
Level 2/3
Contractors holding valid Level 2 or 3 Certifications are approved to perform
installation checkout, startup, programming and operations training, troubleshooting
and servicing for all Veeder-Root Tank Monitoring Systems, including Line Leak
Detection and associated accessories.
Warranty Registrations may only be submitted by selected Distributors.
Содержание Veeder-Root
Страница 1: ...Manual No 576013 763 Revision E Installation Guide Groundwater Sensor ...
Страница 4: ...Contents ii ...