background image

Inform II

Quick Reference Guide

for Healthcare Professionals

BLOOD GLUCOSE MONITORING SYSTEM

Содержание Inform II

Страница 1: ...Inform II Quick Reference Guide for Healthcare Professionals BLOOD GLUCOSE MONITORING SYSTEM...

Страница 2: ...2...

Страница 3: ...ble of Contents Important 4 General Information 6 ACCU CHEK Inform II Meter 10 How to Perform Patient Testing 13 How to Perform Control Testing 21 Storing Test Strip Lot Information 32 Troubleshooting...

Страница 4: ...h patient use following standard precautions and the cleaning and disinfecting procedures found in the ACCU CHEK Inform II Operator s Manual Use gloves Wear a new pair of clean gloves for testing each...

Страница 5: ...tinued Do not dispose of the battery pack with normal domestic waste As a component of the ACCU CHEK Inform II system it must be deemed as potentially biohazardous Treat it accordingly Important Safet...

Страница 6: ...d package inserts for detailed information Be sure to read the Important Safety Instructions and Additional Information section in the manual before operating the system For technical assistance pleas...

Страница 7: ...s such as requiring an operator ID may or may not be used If so configured the ACCU CHEK Inform II system may not allow patient testing when controls have not been run QC Lockout Note on the use of ba...

Страница 8: ...interval or frequency designated by your institution controls have been run but the control values were not in range Error messages appear to alert you to a condition that needs attention Take the act...

Страница 9: ...t Strips ACCU CHEK Inform II Control Solutions ACCU CHEK Linearity Kit if required by your facility guidelines Available for purchase separately Critical Values Obtain laboratory backup for the follow...

Страница 10: ...10 Meter Front View ACCU CHEK Inform II Meter Test Strip Port Touchscreen On Off Button...

Страница 11: ...11 Meter Back View ACCU CHEK Inform II Meter ACCU CHEK Inform II Meter Barcode Scanner Window Battery Pack Reset Button Infrared Window...

Страница 12: ...12 ACCU CHEK Inform II Meter The base unit Charges the meter battery pack Communicates with a data management system if available Base Unit...

Страница 13: ...ith alcohol then let dry 1 Press the On Off button to power on the meter 2 Once the Power Up screen appears touch to proceed to the Operator ID screen or wait 5 seconds and the meter automatically pro...

Страница 14: ...14 4 Touch Patient Test to display the Patient ID screen How to Perform Patient Testing...

Страница 15: ...15 5 Enter or barcode scan patient ID then touch You are prompted to confirm the test strip lot Patient Testing How to Perform Patient Testing...

Страница 16: ...16 6 Verify the test strip lot If correct touch You are prompted to insert the test strip If incorrect touch to select a different test strip lot number How to Perform Patient Testing...

Страница 17: ...to the test strip port as far as it will go in the direction indicated by the arrows on the test strip 8 Wait until the flashing drop appears in the screen before applying the blood How to Perform Pat...

Страница 18: ...yellow dosing area of the test strip Do not apply the blood to the top of the strip Blood is pulled into the test strip by capillary action The meter beeps and an hourglass appears while the meter com...

Страница 19: ...19 10 When the test is completed the result is displayed Touch to enter the desired comments Touch to return to the Main Menu How to Perform Patient Testing Patient Testing...

Страница 20: ...ns and directives for disposal of potentially infectious samples and materials 12 Clean and disinfect between each patient use following standard precautions and the cleaning and disinfecting procedur...

Страница 21: ...Before using the meter for the patient testing the first time At the glucose control intervals established by your facility if established When using a new test strip vial for the first time When usi...

Страница 22: ...ayed repeatedly If you wish to test the performance of the system In addition the following events can be specified during setup as a reason for a glucose control test If a previous control test is ou...

Страница 23: ...to power on the meter 2 Once the Power Up screen appears touch to proceed to the Operator ID screen or wait 5 seconds and the meter automatically proceeds to the Operator ID screen Control Testing Ho...

Страница 24: ...24 3 Enter or barcode scan operator ID then touch to display the Main Menu screen 4 Touch Control Test to display the Control Test screen How to Perform Control Testing...

Страница 25: ...25 5 Touch the control level to be run How to Perform Control Testing Control Testing...

Страница 26: ...26 6 Verify the control lot number If correct touch You are prompted to confirm the test strip lot If incorrect touch to enter or barcode scan a different lot number How to Perform Control Testing...

Страница 27: ...27 7 Verify the test strip lot If correct touch You are prompted to insert the test strip If incorrect touch to select a different test strip lot number How to Perform Control Testing Control Testing...

Страница 28: ...into the test strip port as far as it will go in the direction indicated by the arrows on the test strip 9 Wait until the flashing drop appears in the screen before applying the control solution How t...

Страница 29: ...g area of the test strip Do not apply the control solution to the top of the strip The control solution is pulled into the test strip by capillary action The meter beeps and an hourglass appears while...

Страница 30: ...11 When the test is completed the result is displayed Touch to enter the desired comments Touch to continue with the next level if necessary or to return to the Main Menu How to Perform Control Testi...

Страница 31: ...31 12 Remove the test strip and dispose of it in accordance with applicable regulations and directives How to Perform Control Testing Control Testing...

Страница 32: ...ower Up screen appears touch to proceed to the Operator ID screen or wait 5 seconds and the meter automatically proceeds to the Operator ID screen 3 Enter or barcode scan operator ID then touch to dis...

Страница 33: ...p Lot Information 4 Touch Strip Lots to open the related menu 5 Touch Add if you want to add the information for a new test strip lot from a new code key The Add Strip Lot screen opens Storing Test St...

Страница 34: ...34 6 Insert the new code key in the opening of the code key reader An LED starts flashing green and signals that the reader is ready to transfer data Storing Test Strip Lot Information...

Страница 35: ...ey reader so that a connection can be made between the two infrared windows 8 Touch to begin downloading data The meter provides you with status information on the download Storing Test Strip Lot Info...

Страница 36: ...onfirm the test strip lot information Touch to store the data for this lot number without changes or Touch to modify the data for this test strip lot number before storing Storing Test Strip Lot Infor...

Страница 37: ...ly message appears on the screen Solution Run controls Patient testing cannot proceed until control tests are successfully run The meter displays a non numeric result or error message Solution Consult...

Страница 38: ...05234654001 2012 10 USA ACCU CHEK ACCU CHEK INFORM and COBAS are trademarks of Roche 2012 Roche Diagnostics All rights reserved Roche Diagnostics GmbH 68298 Mannheim Germany...

Отзывы: