RECEIPT OF MATERIAL ON SITE
Check that the delivered parts conforms to the packing list and corresponds to approved drawing. To
identify parts, see spare parts list for nomenclature. If there are missing parts, immediately contact Arit-
co Lift AB.
Check that delivered material is not damaged from the transport. If there are damages, immediately
contact the transport company and Aritco Lift AB. Store the material in its packing material until
installation.
3.1 TOOL-AND FIXING REQUIREMENTS
Before starting the assembly, make certain that all requisite tools and documents are at hand. Such as:
• Hoist (500 kg)
• Lifting device and lifting slings
• Torque wrenches
• Drilling machine / screw - Driving machine with moment clutch
• Drill set (1 – 13 mm)
• Pop rivet drill (3.2 mm)
• Compass saw
• Compass saw blade for metal
• Hammer drill
• Concrete drill (8 – 12 mm)
• Crow bar
• Hammer
• Plumb with line (15 m)
• Spirit level
• Measure tape
• Pop rivet tool
• Plate shearing tool (Right & Left)
• Mandrel (8 mm)
• Screw driver (2.5 – 5.5 mm)
• Screw driver cross (PH 1 + 2)
• Screw driver, Torx T30
• Magnetic screw bit holder
• Magnetic screw bit holder(300 mm)
• Bit PH2
• Magnetic case (10 mm)
• File
• Clamp
• Complete set of sockets and spanners (10 – 19 mm)
• Insulation tester
• Frame and door carriage
• Ladder
• Fixings material for guide rail, frame and doors. For instance expander bolts, chemical bolts etc.
7000 100 en-GB AD
5
Содержание 7000
Страница 1: ...Vector Installation Manual HQ ...
Страница 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Страница 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Страница 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Страница 30: ...ASSEMBLY Attach the next part of the drive screw to the first see chapter 6 26 7000 100 en GB AD ...
Страница 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Страница 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Страница 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Страница 44: ...ASSEMBLY When the mast is correct aligned finally fasten the fixing bolts 40 7000 100 en GB AD ...
Страница 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Страница 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Страница 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Страница 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Страница 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Страница 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...