
Front anchorage pack
FR-AK x 2
SQUARING THE FRAME
Use a piece of glass to square the unit up as shown. Slacken the nuts if necessary
to move the framework into a square position.
Once the frame is completely square tighten up all the nuts.
Remove glass once squaring is complete.
1
F
B
INSIDE VIEW OF FRONT
LEG SHOWING FIXING
INSIDE VIEW OF BACK
LEG SHOWING FIXING
1
1
1
FR
ON
T
SID
E
B
F
SID
E
BA
CK
P8
SQUARING AND FIXING
WEAR APPROPRIATE
SAFETY EQUIPMENT
WHEN DRILLING OR
HAMMERING
PARTS NEEDED
FIXING TO FLOOR
Fit the 'L' brackets to the front legs using
a nut and bolt.
Carefully lay the frame on it’s front and fit
the 'L' brackets to the back legs using a
nut and bolt.
Place the framework in its final position
and drill through the bracket with a 6mm
masonry drill bit, to a depth of 35mm.
Insert the red rawlplug, through the
bracket and into the concrete.
Using a woodscrew, screw through the 'L'
bracket and into the rawlplug.
Repeat for other end.
On BX5 & CX5 models fit an 'L' bracket
to the centre leg. Ensure that the front rail
is not bowed before fixing, otherwise the
centre staging sheets will not fit. A centre
staging sheet can be used to check - see
page 16.
2
If this nut
turns while
tightening,
use a small
pair of pliers
to hold the
nut
FULLY TIGHTEN ALL
BOLTS
Completed front bracket