AI BOX400 (Back version) installation steps
step
Absenicon2.0 Conference AI Box
400
Conference AI Box 400
Step 1: Install the
bead holder on the
two guide rails
Note: Place the two rails symmetrically and install the buckle holder on the front of the rail (groove surface).
Step 2: Install the
guide rail on the left
row of the display (on
the back) and the box
in the penultimate
row.
Step 3: Install the
touch bead card on
the back of the AI
BOX400 (back hang)
box
Step 4:
Install the AI BOX400
(back-mounted) box
on the guide rail and
connect it to the
buckle holder.
(Note that after the control box locks in the buckle, lock the guide rail and fix the M8 screw. To test the
smoothness of the guide rail, you can release the guide rail screw to fine-tune the touch bead buckle into the
position.
)
2.2.2 Installation of infrared 5P extension line and indicator light board
Содержание AI BOX 410
Страница 1: ...21 AI BOX 410 User manual of the control box User Manual version V 1 0...
Страница 15: ...29...
Страница 21: ...35...
Страница 22: ...Step 3 Select the Wi Fi required to be connected and enter the corresponding password...
Страница 25: ......
Страница 26: ...3 6 2 Screen projector guide 3 6 3 IO S MAC screen projection guidance...
Страница 33: ......
Страница 39: ......
Страница 47: ...57 1 Hot spot switch is on 2 Set the password of the wireless hotspot click OK to open the hotspot...
Страница 57: ......