15  

 

 

DOWNPIPE

It can be fit to either end of the rear beam, make 
a decision based on site specific factors.

Cut a round hole 51mm dia in one end of the 
rear edge beam. The can be done by drilling a 
series of 3mm holes and knocking it out or by 
metal holesaw. It won’t be visible when finished.

Fit the galvanised gutter drop RWG17 from the 
top down into the hole.

Drill two 3 mm holes through the underside of 
the end beam and into the flange of the gutter 
drop and then fasten using two pop rivets. Use 
water proof sealant around the hole inside the 
beam.

Join the top three pieces of the down pipe 
assembly, RWG02 + RWG13 + RWG02 with PVC 
solvent welding cement. Position over the gutter 
drop and align with post.

Drill two 3 mm holes through both sides of the 
PVC elbow and into the gutter drop and then 
fasten with two tek screws.

Fit one end of downpipe RWG14 with the elbow 
RWG01 at trim the other end to the desired 
height. Fix with PVC solvent welding cement.

Bend two 270 x 25 mm flat strips ZACO126 to 
shape around the downpipe and to the sides of 
the post and fasten with tek screws.

Immediate maintenance required!

Clean down all roof and beam internal areas 

of metal filings from drilling operations and 

self drilling screws.

If not cleaned these will cause discolouration 

and corrosion to roof sheets and galvanised 

framing sections, see warranty for more details

RWG01

RWG02

RWG02

RWG14

1880 mm

ZACO126

RWG13

1200 mm

ZACO126

RWG17

RWG02

SIDE 

BEAM

REAR

BEAM

Inset from 
side beam 
110 mm

110

Содержание SKILLION CPSN2

Страница 1: ...cyclonic areas Wind rating N2 as per AS4055 2021 If you require a higher wind rating please contact us admin absco com au or 1800 029 701 DOWNLOAD OUR APP FOR ASSEMBLY VIDEOS PLEASE LEAVE A REVIEW Tell us about your experience Visit www abscosheds com au review 5500 mm 5500 mm Concrete slab footings detailed in engineering drawings pg 15 16 1080 1080 3340 3210 inside posts 5350 5220 inside posts 7...

Страница 2: ...rts lists on the following pages prior to commencement To prevent damage in transit some components may be packed inside others almost hidden Carefully examine inside each component to ensure that you have located every item If a discrepancy is found contact Absco Industries immediately Safety Notes The assembly of this product requires some lifting of heavy objects Two person lifts are required S...

Страница 3: ...EDGE BEAM SPLICE PLATE ZACO 187 4 CROSS BEAM SPLICE PLATE ZACO 186 2 COLUMN BRACKET LEFT BKT 07 L 2 COLUMN BRACKET RIGHT BKT 07 R 2 STEEL POST 65 x 65 RHS 2200 mm COL 07 2 STEEL POST 65 x 65 RHS 2250 mm COL 08 1 PVC DOWNPIPE 1200 mm RWG 13 1 PVC DOWNPIPE 1880 mm RWG 14 4 ANGLE BRACE 30 x 30 1045 mm ZACO 120A Bend each column bracket along the slotted centre line holding at the points shown Apply s...

Страница 4: ...RAP ZACO 126 4 JA2 BRACKET ZACO 129 4 JA1 BRACKET ZACO 130 8 JA3 BRACKET ZACO 131 4 JP PLATE ZACO 179 1 PVC DOWNPIPE 45 FITTING RWG 01 2 PVC DOWNPIPE 90 FITTING RWG 02 1 PVC DOWNPIPE DROP RWG 17 FITTINGS PACK 1 PHILLIPS HD DRIVER BIT FAST 038 16 BOLT M10 x 80 mm NUT FAST 022 124 BOLT M10 x 20 mm NUT FAST 018 280 M10 WASHER FAST 017 8 DYNABOLT 10 x 50 mm FAST 015 280 WAFER HD TEK SCREW FAST 014 240...

Страница 5: ...CO 112 ZACO 113 ZACO 105 ZACO 105 ZACO 106 ZACO 106 ZACO 105 ZACO 105 ZACO 106 ZACO 106 ZACO 112 ZACO 113 ZACO 116 ZACO 115 ZACO 116 ZACO 115 Edge beams are also guttering diverting water to rear Downpipe pg 14 FRAME COMPONENT OVERVIEW Roof sheet not shown for illustrative purposes Small components not called out detail to follow Note Not all components have the part number printed on them These c...

Страница 6: ...m bolts nuts and washers as shown It s best to have the nut on the inside of the beam 2x End Beams 5500 mm long 2x Side Beams 5500 mm long ZACO 112 ZACO 115 ZACO 113 ZACO 116 ZACO 187 ZACO 187 1 bolt fitted Each splice plate needs 8 bolts 4 per end M10 WASHER M10 x 20 BOLT EDGE BEAM ZACO187 SPLICE PLATE M10 NUT Cross Beams 4x ZACO228 2x ZACO186 4x ZACO227 2x ZACO186 1x Centre cross beam 5350 mm lo...

Страница 7: ...0 mm long The joiner angles should be positioned on the inside of the edge beams ZACO129 goes to the tall side and ZACO130 the short side Hold with G clamps and fastened with tek screws from the outside of the edge beams Also fasten the bottom overlap with three tek screws Seal all joints with water proof sealant such as silicone as these beams are an internal gutter system The overall dimension o...

Страница 8: ...t the rear posts are 50mm shorter than the front Mark these four hole positions of the BKT07 on the beam and then drill 10 mm holes Don t fasten these brackets yet just make the holes for now Therefore to keep the posts vertical the BKT07 need to be inset 6 mm at their front most edge as shown below Make sure the side of the BKT07 with these four holes along the top edge are put to the side beam 1...

Страница 9: ...as a template drill this 10mm hole in the top of each post Make sure the top edges are flush before marking drilling This hole will be used as a pivot to stand the structure later BKT07 R shown Again using the BKT07 as a template drill these four holes through both sides of the posts and then fasten with four of the longer M10 x 80 mm bolt and a nut with washers both sides 2200 mm Posts 2250 mm Po...

Страница 10: ... orientated with the single hole to the ground and they re on the front and rear faces of the post Join the 5220 mm cross beam to the top brackets of the front posts with four M10 x 20 mm bolt and a nut with washers per sides Repeat this step for the rear posts too Fasten with four of the M10 x 20 mm bolt and a nut with washers both sides Above shows the bolt inserted from inside the post Use a sp...

Страница 11: ...0 mm bolt and a nut with washers both sides Make sure these are flush with the top face of the cross beam to achieve a level surface to attach the roof sheets to Position the ZACO179 joiner plate on the side beam to the dimension shown above and drill two 10mm holes in the beam using it as the template Move the ZACO179 inside the beam and to act as a large washer for the bolts Secure cross beams t...

Страница 12: ...ections to move when lifted With one person holding each post and another at the rear edge beam begin to carefully lift the beam assembly Continue lifting until a second bolt can be fastened to the top bracket and edge beam Secure all four M10 x 20mm bolts with a nut and FRONT POSTS Repeat these steps for the other cross beam assembly Now go around and full tighten all nut and bolt connections inc...

Страница 13: ...tion The long edges of the sheeting should be hard up against the inside of the side edge beams secure along edges at 150mm centres after both rows of sheet have been fixed Lay four sheets left to right with an overlap of one rib The 5th sheet will need to overlap 3 pans 477mm The remaining sheets are again overlapped by 1 rib Where the rear row of sheeting Overlap roof sheets and fasten with rive...

Страница 14: ...two left over don t fold these The strip is fixed with a tek screw into the top of the edge beam and into the pan of the sheet below At the front and rear locate the strips in the centre of the 4th sheet pan 610mm and 14th sheet pan 2090mm from each side Along both sides position the strips so they are in line with the cross beams TIP For these front and rear strips replace the tek screws into the...

Страница 15: ...the down pipe assembly RWG02 RWG13 RWG02 with PVC solvent welding cement Position over the gutter drop and align with post Drill two 3 mm holes through both sides of the PVC elbow and into the gutter drop and then fasten with two tek screws Fit one end of downpipe RWG14 with the elbow RWG01 at trim the other end to the desired height Fix with PVC solvent welding cement Bend two 270 x 25 mm flat st...

Страница 16: ...equivalent to that specified above This drawing is to be read in conjunction with 06205 003 CP03 ROOF PLAN 1 25 TABLE A GROUP B1 BMT B2 BMT B3 BMT B4 BMT COLUMN BRACKET BMT COLUMN WALL THICKNESS BOLT GRADE HD BOLTS FOOTING SIZE 1 1 0 0 8 1 0 1 0 1 2 1 6 8 8 8 D10 700 x 700 x 600 N2 WIND CLASS ONLY NOV 2022 SIDE ELEVATION 1 25 END ELEVATION 1 25 SECTION 1 Scale 1 25 B1 B1 B2 B2 B3 B3 B4 B4 5500 550...

Страница 17: ...ARDS AS 1170 Parts 1 2 loading Codes AS 4600 Cold Formed Steel Structures Code AS 1562 Design and Installation of Sheet Roof Wall Cladding AS 1111 1112 Metric Hexagon Commercial Bolts Screws AS 2312 Guide to the Protection of Iron Steel AS 4100 Steel Structures Code AS 2870 Residential Slabs Footings AS 3600 Concrete Structures 50 x 50 x 1 0 angle x 45 long 2 teks each leg 50 x 50 x 1 0 angle x 45...

Страница 18: ...arrows garden tools etc Storage items that might be adversely affected by any of the above conditions may require additional protection such as being sealed or covered by plastic sheets and or stacked above the concrete floor on timber slats Waterproof sealants may be used to offer further protection where required around joins and screw fixings as can rubber door seals and other products which ar...

Страница 19: ...ss of claiming warranty To make a claim under the warranty within the warranty period you will need to contact the manufacturer directly by phone or email Contact Number 1800 029 701 Contact Email admin absco com au You will be required to produce proof of purchase this is at discretion of the manufacturer at the time of the claim The manufacturer bears the cost of replacing the products or spare ...

Страница 20: ...tions such as extreme heat or cold The product should only be used for storing items such as gardening equipment and should not be used for articles that may be prone to damage if they come into contact with moisture 3 Major Defects If the manufacturer is satisfied that the defect is a major defect the purchase price may be refunded in lieu of providing a replacement product or repairing the produ...

Отзывы: