
PANEL HANDBOOK aH72 SK
V 6.0
10
/ 31
Note: The material breakdown and assembly sheet of the structure will be included in the packaging
of the hybrid solar panels.
3.1
Panels mounting
3.1.1
Example of a mounting system assembly diagram for 4 collectors on a flat roof
Fig. 2.
Row for 4 collectors and flat cover
3.1.2
Separation between triangle supports
The panels will be fixed on a solid base that guarantees their resistance and is suitable for supporting
the loads of the panels, as well as their correct anchorage and fastening. Once it has been checked that
the base meets these requirements, the structure's triangle supports will be assembled and screwed.
The separation between triangles will depend on the number of panels per row. Each structure has its
assembly manual included where the corresponding separation is specified.
3.1.3
Distance between front and rear fixing on triangles
The distance between the front and rear fixing of the triangles will depend on the inclination at which
the panels will be installed. This distance will be indicated in the assembly manual of the structure
enclosed with it.
As an example, for structures with a 35º inclination, the separation between anchorages will be 1510
mm.
Frame
Superior panel rail
Inferior panel rail