Installation Instructions: 

 

Preparation 

 

All parts should be removed from their packaging and inspected for any transport damage and completeness prior to 
installation; you should read these instructions throughout before commencing installation.  
 
We do not accept responsibility for problems that may occur through improper installation. Always ensure you have 
sufficient hot and cold water pressure available to allow correct function before specifying or installing this product. 
 
We strongly recommend installing particle filters and isolation valves to both the hot and cold feed pipes in an 
accessible position. This will help to prevent premature failure of the valves and ease any future maintenance. 
 
Shut off your water heating system and ensure that your mains stopcock is closed. Ensure both the hot and cold 
water supplies are isolated before commencing installation. 
 

 

Key 

Description 

QTY 

Back body 

½” x ½” connector 

Olive 

Nut 

Copper pipe 

Pipe clips 

 

 

 

 

1. 

Open the wall out to the required width and depth for supply pipes (E).

 

 

 

All serviceable parts should be given suitable access to allow easy future maintenance. 

 

 

You should ensure that both the product and required fittings will fit into the depth and area of the 
mounting surface available before installation. Roughly assemble the product and plumbing connections 
to establish the required sizes ‘A-B’. 
 

 

‘A’ 

Cavity depth for supply pipes 
and fixings  
(See parts and contents 
drawing.) 

‘B’ 

 
Finished hole diameter 
 
AB4042 – 60 (mm) diameter 
AB4174 – 60 x 60 (mm) 
AB4094 – 60 x 60 (mm) 

 

 

2. 

Fix inlets and outlet pipes (E) securely to the wall using appropriate fixings (F). Note these fixings should be 
secure enough to support the attached product weight (A) safely during use. 

 

a. 

Before installing this new connection 

it

 

is essential that you thoroughly flush through the 

supply pipes

 in order to remove any remaining solder, swarf or impurities from your system. 

Failure to carry out this simple procedure could cause problems or damage to the workings of any 
attached product and invalidate the warranty. 

Parts and Contents

 

 

 

Chao Wall Mounted Shower Control 

 

Cyclo Wall Mounted Shower Control 

 

 

 

Modo Wall Mounted Shower Control 

 

 
Key 

 
Description 

 
QTY 

 

Valve housing 

Decorative cover 

Handle 

Grub screw (2.5mm) 

Dust cap 

 
Installation 
 

1. 

Pass cover (B) over valve (A) ensuring it is flush to finished wall 
surface.

 

 

2. 

Fit handle (C) onto valve (A) by tightening grub screw (D) using 
a 2.5mm allen key.

 

 

3. 

Watchfully Seal around the decorative cover (B) if applicable to 
prevent water ingress into the wall.

 

 

 
After installation 

 
Once you have visually checked the installation of the new tap and all connections, ensure that all other fittings are closed 
except the tap which should be left open.  
 
Turn on your water heating system and ensure that your mains stopcock is open. Reconnect both the hot and cold water 
supplies to this fitting. 

 

Check the function of flow and function of hot, cold and mixed water. 

 

Turn off the tap and check carefully for any leaks around all connections on the fitting and adjoining plumbing. 
If possible return to the installation after a longer period to double check for slower leaks. If pressure testing equipment is 
available check the installation to the maximum recommended pressure. 
 
Clean the tap to remove any marks created during installation as instructed then place a bag over the product to protect the 
tap until it is ready for use.

 