Installation Instructions:
Preparation
All parts should be removed from their packaging and inspected for any transport damage and completeness prior to
installation; you should read these instructions throughout before commencing installation.
We do not accept responsibility for problems that may occur through improper installation. Always ensure you have
sufficient hot and cold water pressure available to allow correct function before specifying or installing this product.
We strongly recommend installing particle filters and isolation valves to both the hot and cold feed pipes in an
accessible position. This will help to prevent premature failure of the valves and ease any future maintenance.
Shut off your water heating system and ensure that your mains stopcock is closed. Ensure both the hot and cold
water supplies are isolated before commencing installation.
Key
Description
QTY
A
Back body
1
B
½” x ½” connector
0
C
Olive
0
D
Nut
0
E
Copper pipe
0
F
Pipe clips
0
1.
Open the wall out to the required width and depth for supply pipes (E).
•
All serviceable parts should be given suitable access to allow easy future maintenance.
•
You should ensure that both the product and required fittings will fit into the depth and area of the
mounting surface available before installation. Roughly assemble the product and plumbing connections
to establish the required sizes ‘A-B’.
‘A’
Cavity depth for supply pipes
and fixings
(See parts and contents
drawing.)
‘B’
Finished hole diameter
AB4042 – 60 (mm) diameter
AB4174 – 60 x 60 (mm)
AB4094 – 60 x 60 (mm)
2.
Fix inlets and outlet pipes (E) securely to the wall using appropriate fixings (F). Note these fixings should be
secure enough to support the attached product weight (A) safely during use.
a.
Before installing this new connection
it
is essential that you thoroughly flush through the
supply pipes
in order to remove any remaining solder, swarf or impurities from your system.
Failure to carry out this simple procedure could cause problems or damage to the workings of any
attached product and invalidate the warranty.
Parts and Contents
Chao Wall Mounted Shower Control
Cyclo Wall Mounted Shower Control
Modo Wall Mounted Shower Control
Key
Description
QTY
A
Valve housing
1
B
Decorative cover
1
C
Handle
1
D
Grub screw (2.5mm)
1
E
Dust cap
1
Installation
1.
Pass cover (B) over valve (A) ensuring it is flush to finished wall
surface.
2.
Fit handle (C) onto valve (A) by tightening grub screw (D) using
a 2.5mm allen key.
3.
Watchfully Seal around the decorative cover (B) if applicable to
prevent water ingress into the wall.
After installation
Once you have visually checked the installation of the new tap and all connections, ensure that all other fittings are closed
except the tap which should be left open.
Turn on your water heating system and ensure that your mains stopcock is open. Reconnect both the hot and cold water
supplies to this fitting.
Check the function of flow and function of hot, cold and mixed water.
Turn off the tap and check carefully for any leaks around all connections on the fitting and adjoining plumbing.
If possible return to the installation after a longer period to double check for slower leaks. If pressure testing equipment is
available check the installation to the maximum recommended pressure.
Clean the tap to remove any marks created during installation as instructed then place a bag over the product to protect the
tap until it is ready for use.