Parts and Contents
Key
Description
Qty
A
Mixertap body
1
B
Base plinth
1
C
Upper seal
1
D
Fixing stud
1
E
Triangular stabilising bracket
1
F
Lower gasket
1
G
Fixing bracket
1
H
Fixing nut
1
I
Hot Flexi tail
(with integral NRV)
1
J
Cold Flexi tail
(with integral NRV)
1
Installation Instructions:
Preparation
Before installing the new mixer it is essential that you thoroughly flush through the supply pipes in order to remove
any remaining solder, swarf or impurities from your system. Failure to carry out this simple procedure could cause
problems or damage to the workings of the mixertap.
We strongly recommend installing particle filters and isolation valves to both the hot and cold feed pipes in an
accessible position. This will help to prevent premature failure of the valves and ease any future maintenance.
All parts should be removed from their packaging and inspected for any transport damage prior to installation.
Shut off your water heating system and ensure that your mains stopcock is closed. Open the lowest hot and cold
taps in the house and allow the water to run until the cold-water storage tank and pipes are fully empty. Please note,
the hot water storage cylinder (if applicable) will always remain full.
This mixertap requires a 35mm
∅
tap hole, if replacing an existing tap, remove the tap & clean the end of the feed
pipes using wire wool the tap hole area should be free from dirt and sealant.
Loosely position the tap and tail pipes to check if any alteration to the existing pipework is required, if this is the case
do this now.
Installation
1.
Screw studded rod (D) into the base of the tap (A).
2.
Place the upper seal (C) into the base plinth (B) then place the base plinth (B) onto the bottom of the tap
(A).
3.
Screw the hot & cold water tail pipes (I & J) into the base of the tap (A) as shown.
4.
Place the mixertap (A) and base plinth (B) onto the sink/worktop, passing the tail pipes (I & J) and
studded rod (D) through the tap hole and base plinth (B)
5.
Pass the triangular stabiliser (E), lower gasket (F) and then the fixing bracket (G) over the studded rod
(D) and around the flexible tail pipes (I & J)
6.
Fasten the fixing nut (H) securely onto the fixing stud (D) to fix the tap (A) into its correct location.
7.
Connect the hot and cold tail pipes (I & J) to the water mains using ½” BSPx15mm compression fittings.
Note: Non-return valves will be pre-inserted into tail pipes (I & J).
After installation
Once you have visually checked the new fittings and connections, ensure that all taps are closed except the new
mixer tap which should be left open. Turn on the water supply at the mains stop cock. As the system starts to refill,
check carefully for leaks. Once you are fully satisfied that there are no leaks, turn on the water heating.
Clean the tap to remove any marks created during installation as instructed then place the cloth bag that has been
provided to protect the tap until it is ready for use.