Installation Preparation:
All parts should be removed from their packaging and inspected for any transport damage and
completeness prior to installation; you should read these instructions throughout before commencing
installation.
We do not accept responsibility for problems that may occur through improper installation. Always ensure
you have sufficient hot and cold water pressure available to allow correct function before specifying or
installing this product.
We strongly recommend installing particle filters and isolation valves to both the hot and cold feed pipes
in an accessible position. This will help to prevent premature failure of the valves and ease any future
maintenance.
Shut off your water heating system and ensure that your mains stopcock is closed. Ensure both the hot
and cold water supplies are isolated before commencing installation.
Installation:
Key
Description
Qty.
A
Shower arm /
Wall outlet
1
B
Back plate
(*Dependant
on model)
1*
C
½” Female 90°
backplate
elbow
0
D
½” Union
(*Dependant
on model)
1*
E
Finished wall /
ceiling surface n/a
F
Rigid inlet pipe 0
G
Wall fixings
0
1. Open the wall / ceiling out to the required width and depth for supply pipes (F) and elbow (C).
•
All serviceable parts should be given suitable access to allow easy future maintenance.
•
You should ensure that both the product and required fittings will fit into the depth and area
of the mounting surface available before installation. Roughly assemble the product and
plumbing connections (example ½” union (D) to establish the required sizes ‘A-C’.
‘A’
Distance from finished
surface to fixed
connector
‘B’
Cavity depth for
supply pipes and
fixings
‘C’ Finished hole
diameter