
EN - 15
CAT 3
6 Putting into operation
6.2 Adjusting the TCP
1
Loosen the hexagon nut
and adjust the torch mount
to the desired
TCP.
2
Tighten the hexagon nut
To secure the adjusted position proceed as follows:
3
Drill a Ø
5.8 mm bore hole into the bracket
the bore for the dowel screw
.
4
and
4 Scope of delivery on page EN-11
1
Hexagon nut M8
2
Dowel screw 6H7
3
Torch mount
4
Hexagon nut M6
5
Dowel screw M8
6
Bracket
Fig. 8
Adjusting the TCP
1
2
3
6
5
4
Содержание CAT3
Страница 4: ...DE 4 1 Identifikation CAT 3 1 1 EU Konformitätserklärung ...
Страница 24: ...EN 4 1 Identification CAT 3 1 1 EU Declaration of Conformity ...
Страница 41: ...EN 21 CAT 3 Notes Notes ...
Страница 44: ...FR 4 1 Identification CAT 3 1 1 Déclaration de conformité UE ...
Страница 63: ...FR 23 CAT 3 Notes Notes ...
Страница 66: ...ES 4 1 Identificación CAT 3 1 1 Declaración de conformidad de la UE ...
Страница 85: ...ES 23 CAT 3 Notas Notas ...
Страница 86: ...ES 24 Notas CAT 3 Notas ...
Страница 87: ...ES 25 CAT 3 Notas Notas ...