1. Use the base as a template to mark holes.
2. Place lid on top to check level. Double check
your position is correct.
1
1. Tighten nuts to secure base down.
2. Attach hot and cold water pipes (use
appropriate thread sealant).
3
5
Attach and bolt body to base.
6
1. Trim plastic housing to be level with floor
structure (if required).
2. Secure water pipes appropriately.
4
1. Remove base, drill the holes into the
concrete footing to a depth of 60mm.
2. Insert dyna bolts.
CONCRETE FOOTING
2
1.
1.
1.
1.
2.
2.
2.
Hot
Cold
2.
6
0
Connect shower head to Arm.
1. Use the base as a template to mark holes.
2. Place lid on top to check level. Double check
your position is correct.
1
1. Tighten nuts to secure base down.
2. Attach hot and cold water pipes (use
appropriate thread sealant).
3
5
Attach and bolt body to base.
6
1. Trim plastic housing to be level with floor
structure (if required).
2. Secure water pipes appropriately.
4
1. Remove base, drill the holes into the
concrete footing to a depth of 60mm.
2. Insert dyna bolts.
CONCRETE FOOTING
2
1.
1.
1.
1.
2.
2.
2.
Hot
Cold
2.
6
0
Connect shower head to Arm.