ABERLINK LTD
|
VATCH LANE
|
EASTCOMBE
|
GLOUCESTERSHIRE
|
GL6 7DY
|
UK
Tel : +44 (0)1453 884461
|
Fax : +44 (0)1453 882348
|
Email : [email protected]
|
Web : www.aberlink.com
Registered in England No. 7642245
|
VAT Registration No. GB 108 307 537
Enter into Xdy box in Errormap setup. Re-measure pos 2 and pos 1 to ensure correct.
The two readings (although not nominal) should be /-0.002
Position 3
(guide X110 Y-15 Z170)
The probe will not reach the granite (with 10mm stylus), rest on ring gauge
Correction is same calculation as Xdy enter into Xdz if necessary.
After the three measurements are /-0.002, then take the average value and use
this calculation to compensate for linear error
(Average length / gauge length)
– 1= Enter value into X compensation, then remeasure
all 3 positions to verify.
Position 4
(guide X130 Y100 Z325)
Position as shown, do not compensate for Y linear error at this stage.