background image

ABEM Terrameter LS Toolbox 

41 

 

  Windows Display 

The tree panel on the left side can be hidden or shown. This may be useful in order to 
see more of the tabs on the right side. There are three different ways to do this. Either 
use the View/Project Tree menu item, the Shift-Ctrl-P shortcut or use the mouse to 
drag the screen splitter between the two main parts of the program (the tree on the left 
and the tabs panel on the right). 

 

Содержание Terrameter LS

Страница 1: ...User Manual Terrameter LS Toolbox ABEM Product Number 33 3100 08 ABEM 2016 12 07 based on release 2 0 1 of Terrameter LS Toolbox...

Страница 2: ...ABEM Terrameter LS Toolbox...

Страница 3: ...ence gives the fastest response In view of our policy of progressive development we reserve the right to alter specifications without prior notice ABEM will be pleased to receive occasional reports fr...

Страница 4: ...ABEM Terrameter LS Toolbox i...

Страница 5: ...transmitter firmware 15 Setting Timezone and Time 17 5 Data Management and Post Processing 20 Project Management 20 Task Data Post Processing 22 5 2 1 Table 24 5 2 2 Export 26 5 2 3 View Electrode Con...

Страница 6: ...ABEM Terrameter LS Toolbox iii...

Страница 7: ...formats Plotting of electrode contact resistances Viewing the location of the survey on map Plotting data as pseudo sections Plotting of IP decay curves Plotting of full waveform data sweeps Export o...

Страница 8: ...recommended to install the Terrameter LS Toolbox in another folder e g C ABEM Terrameter The Terrameter LS Toolbox installer is available for download from www abem se The installation process is a ma...

Страница 9: ...rameter LS Toolbox 3 The default Start Menu shortcut can be accepted or changed To change click Browse or type directly in the text field Click Next Choose if a desktop icon shall be created or not Cl...

Страница 10: ...ABEM Terrameter LS Toolbox 4 The installation process is now ready to start Click Install The installation is executed...

Страница 11: ...choose if you want to launch the Terrameter LS Toolbox immediately or not Click Finish The installation process is now complete and Terrameter LS Toolbox is ready to be used Terrameter LS Toolbox can...

Страница 12: ...ault the tree structure information is saved under Shared documents The location of the tree structure information can be changed Figure 2 If a tree structure is created and saved under Shared documen...

Страница 13: ...g for possible future re processing of the data Instead of removing the project groups it is possible to start a new tree structure in a different directory of the computer in this way it is possible...

Страница 14: ...details on how to do that Figure 3 LS Instruments context menu Figure 4 Dialog for choosing an IP number and activating the connection Right click on the LS Instruments tree node Figure 3 and select...

Страница 15: ...ABEM Terrameter LS Toolbox 9 Figure 5 Context menu for an unconnected instrument Figure 6 Context menu for a connected instrument Figure 7 Properties section...

Страница 16: ...to transfer such data This is of course only relevant if full waveform data were recorded By checking the checkbox Add to Project Group a project can directly be added to a Project Group If left unche...

Страница 17: ...s for the PC and the instrument respectively the PC to the left and the instrument to the right Use the checkboxes on either list Figure 12 to select the spread s and protocol s to transfer Note The p...

Страница 18: ...button or entering text into the text box If a spread or protocol in the Terrameter LS is to be replaced by a new improved or corrected version Allow overwrite must be checked Figure 11 Spread and pro...

Страница 19: ...same protocol can be present under more than one spread in the tree view Summary information about the spreads and protocols can be viewed by opening the Info node in the tree list Figure 13 or by ri...

Страница 20: ...atest versions 4 4 1 Updating the application software Open the Update Instrument dialog Figure 15 by right clicking on the tree node of the instrument and choosing Update from the context menu Now pr...

Страница 21: ...gramming mode Open the Enable TX Update on Instrument dialogue Figure 18 by right clicking on the tree node of the instrument and choosing Enable TX Updating from the context menu If everything is wor...

Страница 22: ...16 Figure 18 Enable TX Update on Instrument Once the current transmitter is in programming mode it can be programmed using a separate software called SAM BA See separate update guide for instructions...

Страница 23: ...for setting the current transmitter in programming mode Figure 20 Manually select TX Update script file Setting Timezone and Time The Terrameter LS will upon delivery be pre set to a time and timezone...

Страница 24: ...he left Note Only the larger cities will be present in the list If you can t find the exact one you are located in select the closest one Note If there are very few Regions or Cities available in the...

Страница 25: ...ABEM Terrameter LS Toolbox 19 Figure 23 Synchronizing completed...

Страница 26: ...y created project group Projects imported from LS instruments see chapter 4 2 are then added to the project group by selecting Add Project from the context menu Figure 25 Note A database can also be i...

Страница 27: ...ABEM Terrameter LS Toolbox 21 Figure 26 Expanded and collapsed Project Figure 27 Project context menu Figure 28 Project Summary page...

Страница 28: ...be marked as inactive Figure 30 Figure 30 Dormant and active project By clicking the project context menu option Locate Project Database the Windows File Explorer will be opened showing the folder in...

Страница 29: ...show a page similar to the one in Figure 32 Figure 32 Task Summary page Before viewing the task data e g as a pseudo section bad data points can be filtered away Filtering is done via the Table contex...

Страница 30: ...es to export see chapter 5 2 2 The Show data panel can be shown hidden with the button at the top right corner Figure 34 Figure 33 The View in Table page Figure 34 The show hide button at the top righ...

Страница 31: ...Show datapoint s will restore the selected data point s to the handled data point set Select all selects all data points Export visible will export the current data point set using the Data Export di...

Страница 32: ...rode array and whether to include IP data or not only enabled if the data set contains IP data The export format is set in the Filetype panel Figure 37 Data Export dialog 5 2 3 View Electrode Contact...

Страница 33: ...the task This function will only be available if it has been possible for the built in GPS to read signals from GPS satellites hence it will not work for data recorded indoors or for example under a t...

Страница 34: ...ting up plot options E g the choice between plotting apparent resistivity Figure 41 or apparent chargeability Figure 42 is made here Figure 41 Pseudo section view of apparent resistivity with plot opt...

Страница 35: ...The software Erigraph is recommended for pseudosection plotting for reports and presentations It is also useful for plotting inverted model sections from Res2dinv in order to make consistent presentat...

Страница 36: ...ABEM Terrameter LS Toolbox 30...

Страница 37: ...ment is shown By default the diagram shows the transmitted current black line and the active input channels curves in different colours as shown in the legend on the right side of the diagram It is po...

Страница 38: ...ea to zoom in on Figure 45 Zoom in view of full waveform data Zoom by selecting part of diagram with left mouse button pressed Instead of voltages measured by the input channels the output voltage fro...

Страница 39: ...ng the Show Info menu item 5 2 7 View IP Decay Curves The IP Decay Curves page Figure 48 is opened either by right clicking on the tree node of the task and selecting View IP Decay Curves from the con...

Страница 40: ...ontext menu items 5 2 8 Edit Electrode Coordinates The Edit Electrode Coordinates page Figure 50 can be used to add additional coordinate information such as topography to tasks This page is opened by...

Страница 41: ...ile uses the following format 0 0 5 0 5 10 1 15 1 20 1 5 25 2 The first column is the X value meters along your cable spread and the second column is the elevation value The elevation value can be a r...

Страница 42: ...ABEM Terrameter LS Toolbox 36 6 Main Menu The main menu of Terrameter LS Toolbox has four top menus Figure 51 Figure 51 The Main Menu...

Страница 43: ...S1000 SAS4000 Conversion of ADR to XML Spread File The input files for this conversion routine must be in the ADR format that is used by the Lund Imaging System based on Terrameter SAS1000 SAS4000 The...

Страница 44: ...ABEM Terrameter LS Toolbox 38 Figure 52 ADR to XML spread file conversion dialog before conversion Figure 53 ADR to XML spread file conversion dialog after conversion...

Страница 45: ...e current transmission If more measurement points are listed than the available measuring channels they will be measured in a sequence following after each other in a sequence optimised by the instrum...

Страница 46: ...ABEM Terrameter LS Toolbox 40 Figure 55 ORG to XML protocol file conversion dialog before conversion Figure 56 ORG to XML protocol file conversion dialog after conversion...

Страница 47: ...e useful in order to see more of the tabs on the right side There are three different ways to do this Either use the View Project Tree menu item the Shift Ctrl P shortcut or use the mouse to drag the...

Отзывы: