background image

Architectural Kitchen Range Hoods

      

P.O. Box 215

Bodega Bay, 

CA 94

923

 (

800

5

48-

3932

 Fax (

800

5

48-

3930

E-mail: 

web

[email protected]  http://www.abbaka.com

Page 3

IA-031 8/03

VENTILATOR

Range Hood

Black

White

Wht

Grn

1

1

5

 V

o

lt 

6

0

 H

z

P

o

w

e

r S

u

p

p

ly

Capacitor

Green/Yellow
  (Ground)

Brown

White

Black

Blue

Black

MOTOR LEADS

Green

White

Black

Figure 3

Figure 4

DUCT CONNECTIONS

WARNING: To reduce risk of fire, use only metal
ductwork.

1.  Use only round metal duct, elbows and transi-
tions; or rectangular ducting having equivalent
area of square inches as per required duct size.
2.  Tape all joints with duct tape.
3.  Turn on power and check ventilator operation.
4.  Make sure damper opens and closes freely.

WARNING:  Turn off power at the service box
before wiring.

1. Power supply for the ventilator is 115V AC 60
Hz.  See page 2 for specifications.
2.  Run electrical cable between the ventilator and
the range hood or ventilator and wall switch.  See
Figure 3
3.  Remove top enclosure of the ventilator for ac-
cess to the wiring terminal block.
4.  Push the electrical cable up through the bottom
knock out of the ventilator body.  Pull enough wire
up into the  housing to make attachment to the
terminal block.
5.  Connect  white to “NEU”, green to “GND” and
red speed control wire to “LINE”.  See Figure 4.

ELECTRICAL CONNECTIONS

Содержание Hy-Ex 1.0K

Страница 1: ...vent back drafting Follow the heating equipment manufacturers guideline and safety standards such as those published by the National Fire Protection Association NFPA and the American Society for Heating Refrigeration and Air Conditioning Engineers ASHRAE and the local code authorities 5 When cutting or drilling into wall and ceiling do not damage electrical wiring and other hidden utilities 6 Duct...

Страница 2: ...3 Use flashing and roofing mastic to seal the unit to prevent leaks 4 Cut holes for ducting and electrical wiring as shown in Figure 2 Figure 1 Typical Roof Mount 1 Center the duct cutout between roof rafters 2 Install the ventilator so its discharge is down slope and away from prevailing winds According to the Standard Roofing Procedures shingles must cover rear flashing flange and a minimum of 1...

Страница 3: ...equired duct size 2 Tape all joints with duct tape 3 Turn on power and check ventilator operation 4 Make sure damper opens and closes freely WARNING Turn off power at the service box before wiring 1 Power supply for the ventilator is 115V AC 60 Hz See page 2 for specifications 2 Run electrical cable between the ventilator and the range hood or ventilator and wall switch See Figure 3 3 Remove top e...

Страница 4: ... Claims for damages or shortages must be reported within ten 10 days of receipt of products s For any product s received damaged by the forwarding agent THE FOLLOWING INSTRUCTIONS MUST BE FOLLOWED 1 For products delivered by UPS a Concealed Damages Keep all cartons and fillers Call UPS for an inspection and notify ABBAKA immediately b Visible Damages Save all cartons and fillers and file complaint...

Отзывы: