Configuration through PC software 

9.1 

Connected to PC 

 

During configuration, the lift control adaptor can be connected directly to the PC so that the installed software (ABB Welcome PC Configuration Tool) can be 
used. Essentially, there is no need for local power supply during configuration. 
 
Upon completing configuration, click “Send the Configuration” to upload the configured file to the system. Refer to instructions below. 
 
Note: Only supports Microsoft Windows. 

 

Fig. 14 

 
 
 

 

Содержание Welcome M2307

Страница 1: ...n Online Inh alt KNX Doo rEntry 832 20 AP xxx Tit elblat t 832 20 AP xxx ABB 1 9 m od_ 132 3249 806 476 _15 docx 11 108 4 1 VER 1 3 02 20 2017 ABB Welcome Lift control module M2306 M2307 E nde der Liste für Tex tma rke C over ...

Страница 2: ...ting and installation 9 6 1 Requirements for the electrician 10 6 2 Mounting 11 7 User case 12 7 1 High building no more than 16 floors with one elevator 12 7 2 High building more than 16 floors with one elevator 14 7 3 High building more than 16 floors with two elevators 16 7 4 High building more than 16 floors with four elevators 17 8 Operation 18 8 1 User scenario illustration of visitor target...

Страница 3: ...or to installation and or disassembly Work on the 110 V 240 V supply system must be performed only by qualified personnel 2 Environment Consider the protection of the environment Used electric and electronic devices must not be disposed of with household waste The device contains valuable raw materials that can be recycled and should be disposed of at an appropriate recycling facility 2 1 ABB devi...

Страница 4: ...a General Single wire clamps 2 x 22 AWG 2 x 18 AWG Fine wire clamps 2 x 22 AWG 2 x 18 AWG Bus voltage 20 V 30 V DC Size 4 U Protection IP 20 Operating temperature 13 F to 131 F Size M2306 8 50 x 4 33 x 1 77 M2307 8 50 x 4 33 x 1 77 ...

Страница 5: ...all from the outdoor station or the authorized user swipes the registered card or enters the correct password the elevator will automatically go down to the floor where the outdoor station is installed The elevator will then go to the dedicated floor where that resident lives It cannot go to unauthorized floors even when other buttons are pressed Configuration should be performed using the dedicat...

Страница 6: ...stem controller and internal bus OFF Not connected with the system controller and internal bus Blinking Working with the system controller and internal bus 2 ON Power on OFF Power off Blinking Working 3 Connect with M2307 4 Power supply 5 Connect with the system controller and internal bus ...

Страница 7: ... module address The address range is 1 16 Only the left 4 bits are used 4 Power supply 5 Connect with M2306 6 Connect with the lift controller Pos 24 B usch J aeg er Neus truk tur M odul Strukt ur O nline Doku me ntatio n Steu er mod ule Onlin e Dok ume ntati on Für alle Dok ume nte S eiten umb ruch 9 m od_ 126 8898 668 093 _0 docx 521 49 1 ...

Страница 8: ...elcome 8 5 3 Lift control relay module address by binary setting Fig 3 Installer need only read the labeling on the lift control module and adjust according to the given position Only digits 1 2 3 4 are used ...

Страница 9: ...s to flow through the body which may result in electric shock burns or even death Always disconnect the main power supply prior to installation and or disassembly Work on the 110 V 240 V supply system must be performed only by qualified personnel Warning Electric voltage Always disconnect the upstream fuse when working on the lighting system ...

Страница 10: ...wledge and requirements for the installation are as follows Apply the five safety rules DIN VDE 0105 EN 50110 1 Disconnect the power 2 Secure against being reconnected 3 Ensure there is no voltage 4 Connect to earth 5 Cover or barricade adjacent live parts Wear suitable personal protective clothing Use only suitable tools and measuring devices Check the type of supply network TN system IT system T...

Страница 11: ... be installed on mounting rails according to DIN EN 50022 It is highly recommended that M2306 be installed in the elevator motor room on the top floor or the electrical riser while M2307 should be installed in the elevator cabin Fig 4 Fig 5 Dismantle ...

Страница 12: ...ABB Welcome 12 7 Application examples 7 1 High building no more than 16 floors with one elevator One M2306 and one M2307 Fig 6 Topology ...

Страница 13: ...ABB Welcome 13 Wiring with one M2306 and one M2307 Fig 7 ...

Страница 14: ...ABB Welcome 14 7 2 High building more than 16 floors with one elevator One M2306 and multiple up to 16 M2307 units Fig 8 Topology ...

Страница 15: ...7 units Fig 9 Notes 1 The first mini system controller M2301 feeds one M2306 and one M2307 2 An additional M2307 should be locally powered by one mini system controller For example with four M2307 units and one M2306 four mini system controllers are needed ...

Страница 16: ...ABB Welcome 16 7 3 High building more than 16 floors with two elevators One M2306 and multiple M2307 units support two elevators Fig 10 Topology Note The address code cannot be repeated ...

Страница 17: ...ABB Welcome 17 7 4 High building more than 16 floors with four elevators Two M2306 and multiple M2307 units support four elevators Fig 11 Topology Note The address code cannot be repeated ...

Страница 18: ...door station 3 The elevator will go down to the outdoor station automatically so the visitor may enter the elevator 4 The visitor has a set time default of 10 minutes in which to activate the 12th floor button in the elevator Other floors will not be activated at the same time After 10 minutes the visitor must go to the outdoor station to call the resident again 5 The visitor reaches the 12th floo...

Страница 19: ...putting a password or swiping with authorized card 2 The elevator will automatically go down to the outdoor station floor so the resident may enter the elevator 3 The resident has a set time default of 10 minutes in which to activate the 12th floor button in the elevator Other floors will not be activated at the same time After 10 minutes the resident must go to the outdoor station to input passwo...

Страница 20: ...ctly to the PC so that the installed software ABB Welcome PC Configuration Tool can be used Essentially there is no need for local power supply during configuration Upon completing configuration click Send the Configuration to upload the configured file to the system Refer to instructions below Note Only supports Microsoft Windows Fig 14 ...

Страница 21: ...15 No Function 1 Select building number 2 Select floor number 3 Select apartment number 4 Set physical address e g 13 indicates the IS address set by IS switches 5 Set user name 6 Set logical address e g 0703 indicates 7th floor apartment number 3 7 Add data from one apartment to project 8 Upload configuration to system 1 2 3 4 5 6 7 8 ...

Страница 22: ... number 3 Click Add to add a new M2307 4 Select ON or OFF for connecting the relay 5 Select NO or NC for output type 6 Set relay operation time 1 3 600 seconds 7 Show all M2307 parameters Note In order to ensure that the building is configured properly please complete each step before startinging installation in a new building 1 2 3 4 5 6 7 ...

Страница 23: ...t outdoor station number 3 Select relay number of M2307 4 Click Add to associate outdoor station with relay 5 Send all parameters to M2306 6 Input password Default password is 123456 Please write down this password If password is forgotten software must be reloaded Step 4 Associate indoor station with M2307 1 2 3 4 5 6 ...

Страница 24: ...iate indoor station with relay 6 Send all parameters to M2306 7 Input password Default password is 123456 Optional steps Step 5 Export all data from this project or import data for new project Fig 19 No Function 1 Export all elevator control configuration data to one read only Excel file Export the elevator control configuration of each building for future reference 2 Import data for a new project...

Страница 25: ...ABB Welcome 25 Step 6 Save as one new project Fig 20 No Function 1 Save as one new project xml 1 ...

Страница 26: ...ABB Welcome 26 Step 7 Import existing project data to new outdoor station guard unit and lift control Fig 21 No Function 1 Open one existing project xml 1 ...

Страница 27: ...ABB Welcome ...

Страница 28: ...hnical changes or modify the contents of this document without prior notice With regard to purchase orders and or contracts the agreed particulars shall prevail ABB Inc does not accept any responsibility what soever for potential errors or possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained therein Any reproduct...

Отзывы: