ABB UNO-DM-1.2-TL-PLUS-Q Скачать руководство пользователя страница 2

12.

Commissioning

11.

Instruments

UNO-DM-1.2_2.0_3.0_3.3_4.0_4.6_5.0-TL-PLUS-Q-Quick Installation Guide EN-RevA

EFFECTIVE 16-11-2018

© Copyright 2018 ABB.  All Rights Reserved.

Specifications and illustrations are subject to change without notice.  

9.

Line cable and protective devices 

10.

Output connection (AC)

Commissioning

Features and T

echnical Data

13.

Features and T

echnical Data

Protection switch under load (AC switch) and sizing of the line cable

To protect the AC connection line of the inverter, we recommend the installation of a protection device against overcurrent and earth leakages with the following 

features:

UNO-DM-1.2

UNO-DM-2.0

UNO-DM-3.0

UNO-DM-3.3

UNO-DM-4.0

UNO-DM-4.6

UNO-DM-5.0

Type

Circuit breaker with differential magnetic-thermal protection

Nominal voltage

230 Vac

Nominal current

10 A

16 A

16 A

20 A

25 A

25 A

32 A

Magnetic protection feature

B/C

Number of poles

2

Type of differential protection

A/AC

Differential sensitivity

300 mA

ABB declares that the ABB high frequency inverter without a transformer are not manufactured to inject continuous currents of ground fault, and therefore, the 

differential installed downstream of the inverter, type B according to IEC 60755/A 2, is not required.

Characteristics and sizing of the line cable

The cable should be three-pole. The section of the AC line conductor must be sized in order to avoid unwanted disconnections 

of the inverter from the distribution network due to high impedances of the line that connects the inverter to the point of supply 

of electricity.

Line conductor 

cross-section

Maximum length of the line conductor (m)

UNO-DM-1.2

UNO-DM-2.0 UNO-DM-3.0

UNO-DM-3.3

UNO-DM-4.0

UNO-DM-4.6

UNO-DM-5.0

1.5 mm

2

18 m

10 m

6 m

6 m

5 m

4 m

- m

2.5 mm

2

22 m

15 m

11 m

11 m

10 m

8 m

6 m

4 mm

2

40 m

25 m

19 m

19 m

16 m

13 m

10 m

6 mm

2

56 m

38 m

29 m

29 m

24 m

20 m

16 m

The values  are calculated in nominal power condition considering: 

1. a power loss along the line of not more than 1%.

2. copper cable used, with HEPR rubber insulation and placed in open air

Contact us

www.abb.com/solarinverters

The LEDs allow you to view inverter status conditions to be analyzed in greater depth by consulting the manual.

LEDs 

06

POWER Green

Solid when the inverter is working correctly. Flashes when checking the grid or if 

there is insufficient sunlight.

COMM

Green

Activation status of the inverter’s wireless communication

ALARM

Yellow

The inverter has detected an anomaly. The anomaly is shown on the 

“EVENTS” section of the internal webserver.

WLAN

Multicolor

Quality of the wireless communication signal.

GFI

Red

Ground fault on the DC side of the PV generator. The error is shown on the 

“EVENTS” section of the internal webserver. 

Caution! Before performing the operations described below, make sure that you have properly disconnected the AC line downstream of 

the inverter

For the grid connection of the inverter, 3 connections are needed: ground, neutral and phase. The ground connection of the inverter is mandatory.

The connection of the network cable to the inverter is performed by means of the dedicated AC output connector 

10

, by doing the following:

1. Remove the connector head by pressing on the two retaining clips and 

then loosen the cable gland.

2

1

1a

1b

2. Insert the cable into the connector and cut the cable to length

Make sure that the cable bend radius is greater than 4 times the cable 

diameter

3. Prepare the cable according to the following measurement:

N

L

  Max 6 mm²

12mm with ferrules*

8mm without ferrules*

X

Ø10÷14mm

X

Y

L,N 25 mm

Y

  30mm

  z:

10mm max

z

(*): Use properly crimped ferrules only on stranded wire with a conductor 

section values between 1.5 - 4 mm².

4. Install the individual wires (phase, neutral and ground) on the connector 

head according to the instructions printed on each of the three terminals 

(tightening torque 0.8...1 Nm)

5. Close the connector and tighten the cable gland respecting the tightening 

torque (4+1 Nm) to ensure the IP65 degree of protection

1

2

6. Remove the pre-installed protective cap on the inverter.

Insert the counterpart in the AC output connector 

10

 while taking care to align 

the references (present in both connectors) that prevent connection errors.

2

1

3

To maintain the IP protection rating of the inverter, it is mandatory to install the counterpart with the AC cable connected or the protective 

cap, on the AC output connector.  In addition, the connector must not be subjected to tensile forces (examples: do not connect weights to 

the AC cable, do not leave excess wire hanging, etc.).

UNO-DM-1.2

UNO-DM-2.0 UNO-DM-3.0

UNO-DM-3.3

UNO-DM-4.0

UNO-DM-4.6

UNO-DM-5.0

Input

Absolute maximum input voltage (V

max,abs

)

600 V

Input activation voltage (V

start

)

120 V 

(adj. 100...150V)

150 V  

(adj. 100...250 V)

150 V  

(adj. 100...250 V)

200 V 

(adj. 120...350 V)

200 V 

(adj. 120...350 V)

200 V 

(adj. 120...350 V)

200 V 

(adj. 120...350 V)

DC input voltage operating range (V

dcmin

...V

dcmax

)

0.7xV

start

...580 V (min 90 V)

Rated input DC voltage (V

dcr

)

185 V

300 V

300 V

360 V

360 V

360 V

360 V

Rated input DC power (P

dcr

)

1500 W

2500 W

3300 W

3500 W

4250 W

4750 W

5150 W

Number of independent MPPTs 

1

1

1

2

2

2

2

Maximum Input power for each MPPT (P

MPPTmax

)

1500 W

2500 W

3300 W

2000 W

3000 W

3000 W

3500 W

DC input voltage range (V

MPPT min

 ... V

MPPT max

) with 

parallel configuration of MPPT at P

acr

100...530 V

210...530 V

320...530 V

170...530 V

130...530 V

150...530 V

170...480 V

DC power limitation with parallel configuration of MPPT

N/A

N/A

N/A

Linear derating from Max to Null [530V≤VMPPT≤580V]

 

(10)

DC power limitation for each MPPT with independent 

configuration of MPPT at P

acr

 , max unbalance 

example

N/A

N/A

N/A

MPPT1: 2000 W  

[200V≤VMPPT≤530V] 

MPPT2: Pdcr-2000W  

[112V≤VMPPT≤530V]

MPPT1: 3000 W  

[190V≤VMPPT≤530V] 

MPPT2: Pdcr-3000W  

[90V≤VMPPT≤530V]

MPPT1: 3000 W  

[190V≤VMPPT≤530V] 

MPPT2: Pdcr-3000W  

[90V≤VMPPT≤530V]

MPPT1: 3500 W 

[185V≤VMPPT≤480V] 

MPPT2: Pdcr-3500W  

[145V≤VMPPT≤480V]

or 3500W 

[305V≤VMPPT≤480V] 

with no power on 

MPPT1 

(6)

Maximum DC input current (I

dc max

) / for each MPPT (I

MPPTmax

)

10 A

10 A

10 A

20.0 A/10.0 A 32.0 A/16.0 A 32.0 A/16.0 A 30,5A/19-11,5A

Maximum return current (AC side vs DC side)

< 5 mA (In the event of a fault, limited by the external protection on the AC circuit)

Maximum short circuit current (I

sc max

) / for each MPPT

12.5

12.5 A

12.5 A

12.5 A / 25.0 A 20.0 A / 40.0 A 20.0 A / 40.0 A 22.0 A / 44.0 A

Number of input DC connection pairs for each MPPT

1

DC connection type

Quick fit PV connector 

(1)

Type of PV panels connected in input in accordance 

with Standard IEC 61730

Class A

Input protection

Reverse polarity protection

Yes, from a current limited source

Input overvoltage protection for each MPPT- Varistors

Yes

Photovoltaic array insulation control

According to local standard

DC disconnect switch characteristics 

(version with DC disconnect switch)

600 V/25 A

Ø10÷14mm

max. 6 mm²

POWER

COMM

ALARM

WLAN

GFI

06

UNO-DM-1.2

UNO-DM-2.0 UNO-DM-3.0

UNO-DM-3.3

UNO-DM-4.0

UNO-DM-4.6

UNO-DM-5.0

Output

AC connection type

Single phase

Nominal output AC power (P

acr@cosφ=1

)

1200 W

2000 W

3000 W

3300 W

4000 W

4600 W

5000 W

Maximum output AC power (P

ac max@cosφ=1

)

1200 W

2000 W

3000 W

3300 W

4000 W 

(2)

4600 W

5000 W

Maximum apparent power (S

max

)

1200 VA

2000 VA

3000 VA

3300 VA

4000 VA 

(2)

4600 VA

5000 VA

Nominal output AC voltage (V

acr

)

230 V

Output AC voltage range (V

ac min

...V

ac max

)

180...264 Vac 

(3)

Maximum AC output current (I

ac max

)

5.5 A

10.0 A

14.5 A

14.5 A

17.2 A 

(2)

20.0 A

22.0 A

Maximum fault current

<25 A rms (100 ms)

Short circuit current contribution

10.0 A

12.0 A

16.0 A

16.0 A

19.0 A

22.0 A

24.0 A

Inrush current

Negligible

Nominal output frequency (f

r

)

50 / 60 Hz 

(4)

Output frequency range  (f

min

...f

max

)

 47...53 / 57...63 Hz 

(4)

Nominal power factor and adjustability interval

> 0.995;   0.1 – 1  Over/Under excited

Total harmonic current distortion 

< 3.5%

AC connections type

Panel female connector

Output Protection

Anti-islanding protection 

According to local standard

Maximum external AC overcurrent protection

10.0 A

16.0 A

16.0 A

20.0 A

25.0 A

25.0 A

32.0 A

Output overvoltage protection - Varistor

2 (L - N / L - PE)

Operational Performances

Maximum efficiency (η

max

)

94.8%

96.7%

96.7%

97.0%

97.0%

97.0%

97.4%

Weighted efficiency (EURO/CEC)

92.0% / -

95.0%/-

95.0%

96.5%/-

96.5%/-

96.5%/-

97.0%/-

Power threshold of the power

8.0 W

Nighttime consumption

< 0.4 W

Communication

Embedded Communication Interface

Wireless 

(5)

Embedded Communication Protocol

ModBus TCP (SunSpec)

Commissioning tool

Web user interface, Aurora Manager Lite

Firmware Update Capabilities

Locally and remotely

Monitoring

Plant Portfolio Manager, Plant Viewer, Plant Viewer for Mobile 

(7)

Optional board UNO-DM-COM kit

Optional Communication Interface

 RS485 (use with meter for dynamic feed-in control), Alarm/Load manager relay, Remote ON/OFF

Optional Communication protocol

ModBus RTU (SunSpec), Aurora Protocol

Optional board UNO-DM-PLUS Ethernet COM kit

Optional Communication Interface

 Ethernet, RS485 (use with meter for dynamic feed-in control), Alarm/Load manager relay, Remote ON/OFF

Optional Communication protocol

 ModBus TCP (SunSpec), ModBus RTU (SunSpec), Aurora Protocol

Environmental

Ambient temperature range

-25...+60°C /-13...140°F

Ambient temperature derating

above

50°C/122°F

above

50°C/122°F

above

50°C/122°F

above

50°C/122°F

above

50°C/122°F

above

40°C/104°F 

(8)

above

45°C/113°F

Relative humidity

0...100% condensing

Typical noise emission pressure

< 50 dB(A) @ 1 m 

(9)

Maximum operating altitude without derating

2000 m/6560 ft

Classification of environmental pollution 

degree for the external environment

3

Environmental category

Outdoor

Physical

Environmental protection degree

IP 65

Cooling system

Natural

Dimensions (H x W x D)

553 mm x 418 mm x 175 mm/21.8” x 16.5” x 6.9”

Weight

 15 kg/33 lb

Mounting system

Wall brackets

Overvoltage  category  in  conformity  with  IEC  62109-1       

II (DC input)    III (AC output)

Safety

Isolation level

Transformerless (TL)

Certifications

CE, RCM

Safety class

I

Safety and EMC standard

IEC/EN 62109-1, IEC/EN 62109-2, AS/NZS 4777.2,

EN 61000-6-1, EN 61000-6-2, EN 61000-6-3, EN 61000-6-4,

EN 61000-3-2, EN 61000-3-3

IEC/EN 62109-1, IEC/EN 62109-2, AS/NZS 4777.2, 

EN 61000-6-1, EN 61000-6-2, EN 61000-6-3, EN 

61000-6-4, EN 61000-3-11, EN 61000-3-12

Grid standard

Refer to “Update your inverter for new features” page on the ABB Solar website to know which country standard are 

available for your inverter model.

1. Refer to the documen

t “String inverter – Product Manual appendix” available at www.abb.com/solarinverters to know the brand and the model of the quick fit connector.

2. For UK G83/2 grid standard, maximum output current limited to 16A up to a maximum output power of 3600W and maximum apparent power of 3600 VA.

3. The AC voltage range may vary depending on specific country grid standard.

4. The Frequency range may vary depending on specific country grid standard. CE, 50Hz only.

5. As per IEEE 802.11 b/g/n standard.

6. Functionality with unbalanced channels

7. Plant Viewer per Mobile availble remotely only, not for local commissioning.

8. Pacr = 4200 W @ 45°C/113°F.

9. @ Pure sine wave condition.

10. For UNO-DM-5.0 model: Linear power reduction from Max to zero [480V≤VMPPT≤580V]

Note. The features that are not specifi

cally mentioned in this data sheet are not included in the product

Before proceeding with commissioning, make sure you have carried out all the following checks:

  

- Check the correct connection and polarity of the DC inputs, and the correct connection of the AC output and ground cables.

  

-

Check  the  sealing  barrier  of  the  cable  ducts  and  installed  quick-fit  connectors  to  prevent  accidental  disconnections  and/or 

 

avoid compromising the IP65 environmental protection rating.

Commissioning is carried out via Wi-Fi connection to the inverter web user inteface. Initial setup must therefore be carried out via a tablet, notebook or smartphone 

with a Wi-Fi connection. 

To establish the connection and operate with the inverter, it is necessary to connect its input to the DC voltage of the photovoltaic panels.  

  Supply the inverter with DC input voltage from the photovoltaic generator and via AC GRID voltage.

Make sure that the irradiation is stable and adequate for the inverter commissioning procedure to be completed.

• 

 Pre-commissionig phase 1 - Connection to the local Wi-Fi network 

- DEVICE USED TABLET/SMARTPHONE. 

 

Once powered, launch a QR reader for mobile and SCAN the QR code marked with 

 on the label on the right side of the inverter and connect to inverter 

network (tap connect). 

The name of the Wi-Fi network created by the system, that the connection should be established with, will be: 

ABB-XX-XX-XX-XX-XX-XX (where the X is the MAC address) 

After this step wait 10 seconds to allow the WLAN connection 

 

- DEVICE USED LAPTOP.

 

Enable the wireless on the device you are using for the commissioning and search for the network named ABB-XX-XX-XX-XX-

XX-XX, where “X” is an hexadecimal number of the MAC Address (the MAC Address is indicated on the “wireless identification 

label” on the side of the inverter). 

When prompted, type the PK (product key), including the dashes. Example: 1234-1234-1234-1234 as the network password.

• 

 Pre-commissionig phase 2 - Internal web UI access 

- DEVICE USED TABLET/SMARTPHONE. 

 

SCAN this QR code (it is also reported in the inverter pre-commissioning flyer inside the box of the inverter). An internet 

browser page showing the step by step procedure will be open. 

The information contained in this QR code is the IP address of the web user interface of the inverter: 

http://192.168.117.1

Recommended browsers: Chrome from v.55, Firefox from v.50, Safari from V.10.2.1

 

- DEVICE USED LAPTOP.

 

Open an internet browser page and insert http://192.168.117.1 on the address bar.

STEP BY STEP COMMISSIONING WIZARD: 

•  STEP 1 - Administrator/User login credentials

-  Set the Administrator account user and password (minimum 8 character for password): 

Administrator account can open and view the contents of photovoltaic site. Additionally, they can make changes to inverter settings. User and password are CASE 

SENSITIVE.

-  Set the User account user and (optional) password (minimum 8 character for password): 

User account can only read data. It cannot make any changes. User and password are CASE SENSITIVE.

- Click on “Next” button to proceed to the next stage of the configuration wizard.

•  STEP 2 (Optional) - Residential wireless network connection.

 

The parameters relating to the home wireless network (set on the router) that must be known and set during this step are:

-  IP Settings: DHCP or Static. 

If you select the DHCP function (default setup) the router will automatically assign a dynamic IP address to the inverter whenever it tries to connect to the user 

network. 

With Static, the user can assign a fixed IP address to the system. The data which has to be entered in order for IP static address assigning to take place will 

appear. Complete the additional fields at the bottom of the screen (all the fields are mandatory with the exception of the secondary DNS server).

-  Available networks (SSID): 

Identify and select your own (home) wireless network from all those shown in the SSID field (you can carry out a new search of the networks that can be 

detected with the Update button 

 ). Once the network has been selected, confirm.

-  Password: Wireless network password. 

Enter the password for the destination network (if necessary) and start the connection attempt (it will take a few seconds).

- Click on “Connect” button to connect the inverter to the home wireless network.

- A message will ask for confirmation. Click “Next” to connect the inverter to the home wireless network.

-  Once the inverter is connected to the domestic wireless network, a new message will confirm that.

 

The message provides the IP Address assigned by the home wireless network router to the inverter that can be used each time you want to access the internal 

webserver, with the inverter connected to the home wireless network. Take note of it.

-  Click on “Next” button to proceed to the next stage of the configuration wizard.

The IP address assigned may vary for reasons connected to the wireless home router setup (for example, a very brief DHCP lease time). If 

verification of the address is required, it is usually possible to obtain the client list (and the corresponding IP addresses) from the wireless 

router administration panel.

If the inverter loses the connection with the home wireless network, it is available accessing the Wi-Fi network ABB-XX-XX-XX-XX-XX-XX, where “X” is an hexadeci

-

mal number of the MAC Address.

The most common causes of losing connectivity might be: different wireless network password, faulty or unreachable router, replacement of 

router (different SSID) without the necessary setting updates.

•  STEP 3 - Date, Time and Time zone

-  Set the Date, Time and Time zone (The inverter will propose these fields when available).

 

When it’s not possible for the inverter to detect the time  protocol, these fields have to be manually entered.

-  Click on “Next” button to proceed to the next stage of the configuration wizard.

•  STEP 4 - Inverter country standard, Input mode, Meter and Energy policy. 

 

Country standard

Set the grid standard of the country in 

which the inverter is installed.

Input mode

- Indipendent

- Parallel

 Meter

None (installation without meter)

REACT-MTR-1PH (single-phase) 

ABB 3PH (three-phase) 

ABB 1PH (single-phase)

 Energy  Policy

Zero injection

Self consumption

Custom

From the moment that the grid standard 

is set, you have 24 hours to make any 

changes to the value, after which the 

“Country Select > Set Std.” functionality 

is blocked, and the remaining time will 

have to be reset in order to have the 

24 hours of operation available again 

in which to select a new grid standard 

(follow the procedure “Resetting the re

-

maining time for grid standard variation” 

described in the relevant section).

See the relevant section of this guide 

to know how to physically set the input 

mode

If the selected meter is three-phase addi-

tional requested fields will appear:

-  Meter Phase: select the phase to which 

the inverter is connected. 

When a meter type is selected is possible 

to set also the Energy Policy fields that 

allows to manage the energy produced 

by the PV plant.

-  Zero injection: The system automatically 

manages power flows in order to avoid 

the injection of energy to the grid.

-  Self consumption: The system automat-

ically manages power flows in order to 

maximise self-consumption. 

-  Custom: The system automatically 

manages power flows in order to avoid 

feeding the grid with power greater 

than: PDC x Plim where PDC is the 

power of the photovoltaic generator 

(“PV GENERATOR POWER” param

-

eter) and Plim is the output power limit 

with respect to PDC(%) (“FEED-IN 

POWER” parameter).

-  Confirm the settings by clicking “DONE”; the inverter will reboot at the finish of the meter test phase (if installed).

-  

After the wizard is completed, the system will power-on. The inverter checks the grid voltage, measures the insulation resistance of the photovoltaic field with 

respect to ground and performs other auto-diagnostic checks. During the preliminary checks on the parallel connection with the grid,  the “Power” LED keeps 

flashing, the “Alarm” and “GFI” LEDs are off.

 

If the outcome of the preliminary checks on the grid parallel is positive, the inverter connects to the grid and starts to export power to the grid. The “Power” LED 

remains fixed on while the “Alarm” and “GFI” LEDs are off.

To address any problems that may occur during the initial stages of operation of the system and to ensure the inverter remains fully functional, 

you are advised to check for any firmware updates in the download area of the website www.abb.com/solarinverters or at https://registration.

abbsolarinverters.com (instructions for registering on the website and updating the firmware are given in this manual).

 

 

SN WLAN: SSSSSSSSSS
PN WLAN: PPP.PPPPP.PP
MAC: XX:XX:XX:XX:XX:XX

SN Inverter: SSSSSSSSSS

MAC: XX:XX:XX:XX:XX:XX

PK: KKKK-KKKK-KKKK-KKKK

Remove and apply 

on the Quick

installation guid

e

Отзывы: