![ABB UC Series Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/abb/uc-series/uc-series_maintenance-manual_5259016.webp)
16
Maintenance guide UCG
|
1ZSE 5492-124 en, Rev 6
Use the filtering equipment or the pump to drain oil from the
on-load tap-changer into carefully cleaned oil drums. Connect
the pump to the oil valve and drain the oil from the diverter
switch housing and the conservator. Draining can be effected
quickly if filtering equipment is used and at the same time the
whole oil quantity will be filtered once. Remove the cover of
the diverter switch housing while draining.
WARNING
There is always a cushion of explosive gases in the
top of the diverter switch housing. No open fire, hot
surfaces or sparks may be present during opening
of the housing or draining from the valve. After the
cover is removed let the gas vent away approximately
15 minutes before any work is started.
WARNING
When oil that has been used in a diverter switch
housing is pumped out, conducting tubes and hoses
that are earthed should be used to avoid the risk of
explosion due to the gases produced by the arcs
during service.
Drain the remaining oil in the bottom of the housing by using
a hose.
3.5 Lifting and cleaning the diverter switch
The weight of the diverter switch is approximately 90 kg.
Lift the diverter switch partly so you can flush it with oil. After
careful flushing, lift the diverter switch from the housing and
wipe it with rags. Lift according to Fig. 4.
WARNING
Make sure the lifting equipment is properly fixed to the
cover flange before the diverter switch is lifted.
CAUTION
When lifting the diverter switch, use a manually
operated telpher to avoid damages on the diverter
switch. Make sure that the end of the tie-rod or its
coupling is kept clear of the inner edge of the flange.
If the on-load tap-changer is equipped with an oil
filter unit for continuous oil filtration from ABB and
it is maintained and operated according to our
instructions, the flushing and wiping of the diverter
switch is not necessary.
Fig. 3. Diverter switch, general arrangement.
Guiding pins
Plug-in contacts
Shielding ring
(only for impulse
withstand
voltages to
earth exceeding
380 kV).
Lifting device
Buffer springs
Tie-rod
Coupling
with driving-
pin
Lifting eye
Fig. 4. Lifting arrangement.
Lifting eye
Manually operated telpher