background image

9.

 

If the state remains 

Not receiveing

 for more than 10 minutes, click on your email ID at the top right of the 

screen and click on ‘Event Ingestion Logs’ in the dropdown.

 

 

 

 

 

 

 

 

 

 

 

 
 
 

10.

 

Check if there is some log generated at the time of installation of the TrackSo IoT Gateway device. 

a.

 

If 

NO, 

please restart the device and try the same flow again. 

b.

 

If 

YES, 

email us at 

[email protected]

 to consult the same. 

Содержание TRIO-20.0-TL-OUTD

Страница 1: ...e the Communication Board inside the DC Wiring Box as shown in Figure A2 3 Please ensure you have female 12 pin connector to connect wires plug in to the board 4 Connect the TrackSo IoT gateway to any one of the RS 485 ports as shown in Table AT1 Figure A2 ABB connection with TrackSo IoT Gateway Table AT1 ABB RS485 chip connections with TrackSo IoT Gateway ABB Pin No Assignment TrackSo Pin No Assi...

Страница 2: ...e inverters via RS485 set the same baud rate on each inverter SETTING THE INVERTER ID The inverter ID is used to identify the inverter in a RS485 connection Set a different inverter ID for each inverter in the PV plant Otherwise the inverters cannot be correctly identified No inverter should have Auto as its address An address can be chosen freely from out of 2 to 63 On the last inverter in the RS...

Страница 3: ...OCOL Communication Card Settings Set the RS 485 termination resistance based on where the inverter is located in a daisy chain Single Inverters If a single inverter is connected to the monitoring system activate the termination resistance of the communication line by switching switch a12 or a13 to ON position Set the Correct Date Time Select Modbus RTU Communication Protocol ...

Страница 4: ...respondence between signals and activate the termination resistance of the communication line in the last element of the chain by switching switch a12 or a13 to ON position being careful to switch the switch of the serial line used PC or PMU The above details are also mentioned in the Installation Operation Manual for ABB Inverters ...

Страница 5: ...he installed location LED NAME DESCRIPTION GREEN POWER Light when Power on the device RED GSM LED Status Connection State Flashing ON for 100ms and OFF for 100ms SIM Card not found Flashing ON for 500ms and OFF for 500ms Searching for GSM Network Flashing ON for 0 1s and OFF for 2 9s Once at every 3sec GSM Network Registered Flashing twice at every 3sec GPRS IP Connected Flashing 5times GPRS IP Se...

Страница 6: ...ted NC not connected PIP Connected to TrackSo Server or not CONT connected NC not connected LOG no of data points stored in devices incase of no interet 6 If the GSM light starts flashing 5 times then Login to www trackso in with your Username Password 7 Click on Units from the menu bar You will be able to view your installed unit in the table as shown below 8 Check if the Status becomes Receivein...

Страница 7: ...op right of the screen and click on Event Ingestion Logs in the dropdown 10 Check if there is some log generated at the time of installation of the TrackSo IoT Gateway device a If NO please restart the device and try the same flow again b If YES email us at we freespirits in to consult the same ...

Отзывы: