45/72
TLE Series 625 to 1000 PurePulse™ UL S2
UPS Installation Guide / REV-B
4.9.1
TLE Series 625 & 750 - Power connection with Common Input Utility
Fig. 4.9.1-1 TLE Series 625 & 750 - Power connection Common Input Utility
Power connection cables are connected to bus bars using
M12 bolts
.
The bolts of the connection cables must be tightened with a torque wrench at
530 Lb-in / 60 Nm
.
Common Input Utility - Rectifier / Bypass
L1-1
Rec Bypass Phase A (L1)
L2-1
Rec Bypass Phase B (L2)
N
Neutral
L3-1
Rec Bypass Phase C (L3)
PE
Ground
Note!
The interconnection links BR1, BR2 and BR3 must remain connected (see Fig. 4.9.1-1).
Output Load
L1
Load phase A (L1)
L2
Load phase B (L2)
L3
Load phase C (L3)
N
Neutral
PE
Ground
External Battery connection
+
Positive pole of the Battery
-
Negative pole of the Battery
PE
Battery cabinet Ground
Bolt Size/Torque:
M10
/
355 Lb-in - 40 Nm
Warning!
Before closing the “External Battery Fuses”, verify for correct polarity of the Battery connection.
Note!
To meet standards concerning electromagnetic compliance, the connection between the UPS
and external Battery must be done by using a shielded cable or suitable shielded (steel)
conduit!
Position of the bus bars for
cables input from the top of the UPS (see Section 4.9)
Load
L3
Load
L2
Load
L1
BR3
BR2
BR1
L1-1
Interconnections links
BR1, BR2 and BR3
must remain connected
Typical installation
using common NEMA
two hole lugs
PE
!
L2-1
L3-1
N
Utility Neutral
Load Neutral
1
Rectifier
Utility
Q1
TLES_
UL_6
25-750
_S2_UP
S conn
ection
comm
on_A
BB_0
1US
N
Utility Neutral
Load Neutral
Typical installation
using common NEMA
two hole lugs
+
_
PE
TLES_UL_625-75
0_S2_UPS conne
ction battery_AB
B_01US
In/Out Section cabinet
Power Section cabinet