ABB
has Sales & Customer
Support expertise in
over 100 countries
worldwide
www.abb.com
SECURITY ACCESS
ENTER CODE 0
LOAD CHART
PAGE
OPERATING PAGES
(Channel displays, date/time)
OPERATING PAGES
(Channel displays, date/time)
TO START RELOAD
PRESS ENTER
LOAD NEW ABB CHART
1
2
3
4
5
17
18
The Company's policy is one of continuous product
improvement and the right is reserved to modify the
information contained herein without notice.
© ABB 2003
Printed in UK (08.03)
Boiler 1 Temperature
A3 236.7
°
C
Raise and Lower
Sideways Scroll
Down Scroll
Pen Lift
Enter
Channel
Identifier
Channel Tag
Measured
Value
Units
Used for adjusting parameters or
text messages.
Lifts and lowers the pen on
successive operations.
Used to confirm selections/
adjustments.
Frame 1
Page 1
Page 2
Advance to
next page
Frame 2
Advance to
next frame
Frame 1
Frame 2
Release
tension bar
Lift chart guide
Feed chart
through
cassette
Pull back
tension bar
Fit paper into
rear t r a y
Pull 6 or 7 folds of chart through the cassette
and fit chart into front paper tray
Align and fit chart over lugs
Close chart guide
Refit cassette to instrument
Withdraw cassette
Lift catch
6
7
8
9
10
11
12
13
14
15
16
15
IM/SR100B–Q
Issue 1
DISPLAYS AND KEYS
LOADING A NEW FAN-FOLD CHART
1
Press
until the
SECURITY
ACCESS
page is displayed.
2
Enter the access code for the
LOAD
CHART
page (the default is 0).
3
Select the
LOAD
CHART
page
4
Press
to select the
START
RELOAD
frame.
5
Press
to stop recording.
Note.
Channel data is not buffered during chart reloading.
Caution.
Once
chart loading is
complete, ensure the
correct chart type is
set in the
Chart Control
Configuration Page
–
see
Section 3.4.1
in
the
User Guide.
17
Press
to
resume recording.
18
Press
until the
operating page is
re-displayed.
ABB Limited
Howard Road, St. Neots
Cambridgeshire, PE19 3EU
UK
Tel: +44 (0)1480 475 321
Fax: +44 (0)1480 217 948
ABB Inc.
125 E. County Line Road
Warminster, PA 18974
USA
Tel: +1 215-674-6000
Fax: +1 215-674-7183