 CAUTION

Always keep in mind the recommended safety procedures when working in medium voltage equipment.
For the safety of personnel extracting the controller of the MCC, all components should be electrically disconnected by means of a visible break, securely 
grounded, locked out and tagged in accordance with personnel precautions.

REMOVAL:

(Refer to Figure 4 for compartment detail and Appendix A for controller detail). 

1.  Confirm (through window) that controller has been opened and racked to the disconnect position.
2.  Open MCC controller compartment door to its fully opened position. The interlocking system prohibits racking while the door is open.
3.  Align lift truck left and right platform guides with MCC latch openings.
4.  Raise platform for easy insertion of platform guides, then lower lift truck until platform guides are fully engaged and hooked into MCC compartment cell.
5.  Pull back on lift truck to insure platform is fully engaged and level.
6.  Grasp lower truck handles on both sides of controller and pull handles outward to unlatch the controller from the MCC frame.
7.  Pull controller from compartment onto lift platform insuring cell interlock tabs are engaged into the platform slots.
 
 

RACKING:

 

The racking system is unique and features two-positions:

“Test/Disconnect” 

position, primary contacts are separated from the bus contacts while the secondary contacts remain engaged to the controller to be tested. 

Shutters shall be interlocked in the closed position

“Connected”

 position, both primary and secondary contacts shall be engaged.

CONTROL CIRCUIT CHECKOUT:

The preferred method to check the control circuit is to furnish a separate temporary control power source of the required control voltage rating. The temporary 
source must have a properly coordinated backup protective device in the circuit.
Set the device to clear any faults that might occur. Initially all controllers should be racked out (“DISCONNECTED” position) and the main circuit deenergized and 
grounded. When AC control power is from control power transformers in the MCC, remove all fuses in the transformer circuits.

1.  Make sure all controller are open (OPEN).
2.  Rack the controllers out to the open position (DISCONN.).
3.  Open all control power source contacts, if supplied.
4.  Check each control switch or push-button. Make sure that they are open position (OPEN).
5.  Connect a temporary control power source to the circuit load terminals in the MCC. Energize the control circuit from the temporary control power source.
6.  Rack the controller to the connected position (CONN.). Open and close the controller to verify the correct connection in the secondary plug. Repeat the same 

operation for every controller assembly, one at a time

7.  Test the controllers for closing and tripping, operated on manual and electrically through the control circuit, while they are in the “DISCONN.” position.
8.  De-energize the control circuit. If AC control power is from transformers in the MCC, remove the separated temporary control power source. Reinstall all fuses 

in the transformer circuit.

9.  Set all relays, regulators and other devices for proper operation of loads. The factory does not set the relays.

NOTE: Verify the proper phasing of all main circuits according to diagram.

9  

SafeGear

®

 Motor Control Center Controller 

Installation, Operation and Maintenance Manual

Содержание SafeGear

Страница 1: ...SafeGear Motor Control Center Controller Installation Operation and Maintenance Manual 2017...

Страница 2: ......

Страница 3: ...Safe Practices 2 3 Receiving Handling and Storage 3 4 General overview 4 5 Normal Service Conditions 4 6 Construction 5 7 Extraction Truck Assembly 5 8 Racking System and Disconnect 6 9 Shutter s Char...

Страница 4: ...tion primary contacts are separated from the bus contacts while the secondary contacts remain engaged to the controller to be tested The connection of secondary circuits shall be completely automatic...

Страница 5: ...ion or maintenance of these power controllers DO NOT work on an energized controller DO NOT work on a controller unless all components are disconnected by means of a visible controller and securely gr...

Страница 6: ...available for use with the SafeGear MCC controller Once removed from the shipping container the controller wheels are designed to move the controller across a clean smooth paved even surface Care mus...

Страница 7: ...osphere Table 2 If the contactor is to be used in conditions other than those specified above please consult the factory Controller Weight Approximate Controller 400 A 720 A Maximum Weight approximate...

Страница 8: ...to the controller itself in lieu of being inside the MCC controller cell Vacuum controller power fuses control power transformer CPT and all auxiliary contacts are mounted on a truck assembly and are...

Страница 9: ...oller to be tested Interlocks The truck has three different mechanical interlocks in the controller construction 1 The first makes it impossible to rack the controller in with the door open Highlighte...

Страница 10: ...conection with the primary contacts Procedure Before placing the contactor inside the module is necessary to manually charge the springs showns Steps for charging the springs manually 1 The spring is...

Страница 11: ...lift truck 3 Raise platform for easy insertion of platform guides then lower lift truck until platform guides are fully engaged and hooked into MCC compartment cell 4 Pull back on lift truck to insur...

Страница 12: ...CUIT CHECKOUT The preferred method to check the control circuit is to furnish a separate temporary control power source of the required control voltage rating The temporary source must have a properly...

Страница 13: ...gaging the lift trucle 2 Ground Bus 3 Interference Blocking Plate 4 Secondary Disconnects 5 Wheel Rails 6 Shutter 7 TOC Switch Fig 4 Basic Cell 6 7 2 5 1 4 3 SafeGear Motor Control Center Controller I...

Страница 14: ...t need to be inspected and lubricated Apply grease Moykote 33 to entire racking screw pin and bushing surfaces Inspect the position Release Shaft 3 cell locking tabs 7 and secondary Locking Tab 1 for...

Страница 15: ...ally operated using controls in the MCC or electrically charged after manual operation of the controller in a MCC aisle Test Cabinet A test cabinet is a wall mounted control cabinet connected to a sep...

Страница 16: ...tatus 6 Local Trip 7 Collar 8 Racking Screw 9 Position Release Lever 10 Insertion Removal Handle 11 Cell Interlock Tab 12 Truck 13 Wheel 14 CPT 15 Shutter s Charge Mechanism 16 Fuse Box 2 3 7 8 9 10 1...

Страница 17: ...Appendix B Basic Controller Dimensions DRAWOUT 400 A CONTROLLER DRAWOUT 720 A CONTROLLER SafeGear Motor Control Center Controller Installation Operation and Maintenance Manual 14...

Страница 18: ...owntime of the equipment continues to rise What happens with a phase loss When a 3 phase motor runs with one phase missing the remaining 2 phases will take more load from the missing phase making them...

Страница 19: ...uld be electrically disconnected by means of a visible break securely grounded locked out and tagged in accordance with personnel precautions spelled out in ANSI ASSE Z244 1 Control of Hazardous Energ...

Страница 20: ...the blow fuse mechanism for a 720 A controller 1 Remove the plastic bolts on the cover that supports the blown fuse switch 1 Remove the blown fuse mechanism 3 4 17 SafeGear Motor Control Center Contro...

Страница 21: ...4 bolts that fix the fuse 1 Extract the insulation barrier between the fuses 1 The failed power fuse can be removed 5 6 7 SafeGear Motor Control Center Controller Installation Operation and Maintenan...

Страница 22: ...the same size 1 Tighten the 4 bolts which fix the fuse with a torque of 13 pound foot lb ft 1 Reinsert the insulation barrier between the fuses 8 9 10 19 SafeGear Motor Control Center Controller Inst...

Страница 23: ...wn fuse mechanism just as mentioned in point 2 and verify its right operation 1 The fuse replacement is complete 11 12 13 1 Tighten the plastic bolts on the cover that supports the blown fuse switch S...

Страница 24: ...time with terminals 3 4 jumpered and switching power on and off to terminals 1 2 is between 280 320 ms The HCV 5HA opening time with terminals 1 2 continuously powered and switching opening contacts c...

Страница 25: ...ss energy A button in front of the controller Fig 1 is used for manual trip manually when deenergized The trip mechanism is located on the contoller compartment door Fig 2 This is an optional feature...

Страница 26: ...the silicon varnish Check the main contact wear in the vacuum interrupter If the wear gauge can be inserted then there is sufficient contact material available for continued use If the gauge cannot b...

Страница 27: ...carried out in a manner of ways depending upon material of product Below is thecrecommended method of disposal for various raw materials ABB is committed to complying with the relevant legal and othe...

Страница 28: ...ion products services or related graphics contained in the document for any purpose Any reliance placed on such information is therefore strictly at your own risk ABB reserves the right to discontinue...

Отзывы: