background image

44

E1.2

© Copyright 2014-2019 ABB. All rights reserved.

 

www.abb.com

For more information please contact:
ABB S.p.A.
Via Pescaria, 5
24123 Bergamo - Italy
Phone: +39 035 395 111

45

E2.2-E4.2-E6.2

Содержание SACE Emax 2 E1.2

Страница 1: ...8 disponibile anche nel greasing kit ABB 1SDA076082R1 WARNING Lubricate where indicated by the symbol using grease of the mobilgrease 28 type also available in the ABB greasing kit 1SDA076082R1 ACHTUN...

Страница 2: ...E 1F 1G 1H M6 int 6 M4x10 M4 Group 1 1x 2B A1 2A 2C 2D 2E 2F 2G 1L A1 2H 2L 2M 2N 2P 2Q M4 int 4 M4x10 Group 2 1x M4x7 F ONLY 2 1 2 1 1 A1 3B 3A 3C 3D 3E 3F 3G M6x10 int 6 ext13 1 M6x40 Group 3 Group...

Страница 3: ...X 4Y 4Z M5x8 4 M4 2 4E M4 Estraibile Withdrawable Ausfahrbar d brochable Extra ble Montaggio a parete wall mounting Wandanbau montage sur paroi montaje en la pared Montaggio a pavimento floor mounting...

Страница 4: ...e apoyo para el cable Foratura piano di appoggio per passaggio cavi Mounting surface drilling for cable Bohrung Auflagefl che f r Kabel Per age plan d appui pour le c ble Taladrado de la superficie de...

Страница 5: ...6 10 8 SACE Emax 2 ABB E1 2 W E1 2 W 7 WALL MOUNTED E1 2 F WALL MOUNTED E1 2 F E1 2 F 9 4K 4X 4W 4Y 2 3 1 4 1 2 4 3 3 Nm 4R 4Q 4T 4L 4L 4O 4M 2 Nm 4N 17 7 lb in 26 5 lb in 5 6...

Страница 6: ...UNTED E1 2 F FLOOR MOUNTED E1 2 F 13 2 3 1 1 4E1 3 4B 2 Nm 3 4B 2 Nm 4C 2 2 Nm 4U 4V 4I 4H 4H 4H 17 7 lb in 17 7 lb in 17 7 lb in 4A 2 Nm 2 1 4E1 4S 3 2 Nm 4H 17 7 lb in 17 7 lb in 1 1 4E1 3 4B 2 Nm 3...

Страница 7: ...eispiel f r Wandanbau Exemple pour montage sur paroi Ejemplo para montaje en la pared Esempio per montaggio a parete Example for wall mounting Beispiel f r Wandanbau Exemple pour montage sur paroi Eje...

Страница 8: ...SACE Emax 2 ABB 18 19 E2 2 E4 2 E6 2 F W 20 E2 2 E4 2 E6 2 F W 2E 2L 3 Nm 26 5 lb in 90 3 1 2 1 2 1 2 1 1 1 2 2 2...

Страница 9: ...ero scorrimento delle parti in movimento Make sure the moving parts slide freely Ungehinderte Bewegung der Bewegungsteile berpr fen V rifier que les parties en mouvement coulissent librement Compruebe...

Страница 10: ...e X1 nach unten gedr ckt halten die Madenschraube X2 anziehen bis das Spiel zwischen dem Bolzen X4 und der Stange aufgehoben ist und die Gegenmutter X3 anziehen Wenn dieser Vorgang schon von ABB vorge...

Страница 11: ...Nm 44 3 lb in 3A 5 Nm 3C 3F 3B 3F 3E 44 3 lb in 1 2 3A Premontare fascette per inserimento cavi Pre assemble the cable clamps Die Kabelbinder zum Montieren der Kabel vormontieren Pr monter les collier...

Страница 12: ...ible cables to circuit breakers reduce the number of curves as much as possible maximum sum of curves 360 The curves must have radius min 70mm min 2 76 Die Kabel in die Kabelbinder einstecken wie es i...

Страница 13: ...ndiqu e Mantener fija con una pinza la vaina y enroscar con una llave inglesa Ch8 la tuerca a la cota indicada 1L L 6 mm L 0 24 1 1E 1L 1B Route cables below CB fixed parts and fasten them to switchge...

Страница 14: ...e comme indiqu par la fl che 1 jusqu ce que l embout de la partie oppos e aille en but e comme indiqu par la fl che 2 et marquer le c ble pour la coupe au niveau du plan indiqu par la fl che 3 et coup...

Страница 15: ...Kabel auf der H he der Ebene die von Pfeil 6 angezeigt wird zum Schneiden vorbereiten und wie von Pfeil 7 gezeigt durchschneiden Tirer le c ble dans la gaine comme indiqu par la fl che 4 jusqu ce que...

Страница 16: ...tre chang e apr s le r glage ATENCI N Apriete los abrazaderas para asegurarse de que la forma de los cables no se puede cambiar despu s de la regulaci n 1D OK 1F 1H 1 1B B 2 3 7 Nm 32 8 lb in B consi...

Страница 17: ...e 14 Eseguire alcune manovre di chiusura e apertura quindi verificare la battuta dei tiranti Y4 sul piano Y3 ADJUSTMENT N B During adjustments when tightening or loosening the nuts do not allow the ti...

Страница 18: ...eur CB1 5 Fermer le disjoncteur CB2 et r p ter les points 3 1 et 3 2 6 Ouvrir le disjoncteur CB2 7 Effectuer quelques man uvres de fermeture et d ouverture puis v rifier la but e des tirants Y4 sur le...

Страница 19: ...i Mal wiederholen Am Ende des Tests die Einstellungen und den festen Sitz der Zuganker sicherstellen CONTROLE M CANIQUE R armer les ressorts des commandes des disjoncteurs et effectuer les op rations...

Страница 20: ...44 E1 2 Copyright 2014 2019 ABB All rights reserved www abb com For more information please contact ABB S p A Via Pescaria 5 24123 Bergamo Italy Phone 39 035 395 111 45 E2 2 E4 2 E6 2...

Отзывы: