
10
E X TE R N A L BAT TE RY MODU LE FOR RT G 2 5 -10 K VA U L
STATUS:
Approved
SECURITY LEVEL:
Public
DOCUMENT ID:
4NWD005661
REV:
A
LANG:
EN
PAGE:
10 / 20
© Copyright 2022 ABB. All rights reserved.
—
4 3 Check the inside package
Unpack the package and check the package contents. The shipping package contains
• EBM module x1
• User manual x1
• Battery connection cable x 1
—
4.3-1
• Mounting ear (left) x 1
• Mounting ear (right) x 1
• Mounting ear screw(M4) x 8
• Screw(M6) x 14
• Nut(M6) x 4
• Foot extend(long) x 4
• Foot extend(short) x 4
• Rail slide (left) x 1
• Rail slide (Right) x 1
—
4.3-2
—
4 4 Installing the EBM
It is necessary to select a proper environment to install the unit, in order to minimize the
possibility of damage to the battery bank and extend the life of the batteries. Please
follow the instructions below:
1. Keep at least 20cm (8 inches) clearance from the rear panel of the unit from the wall
or other obstructions.
2. Do not block the airflow to the ventilation openings of the unit.
3. Please ensure the installation site's environmental conditions are in accordance with
the unit’s working specifications to avoid overheating and excessive moisture.
4. Do not place the unit in a dusty or corrosive environment or near any flammable
objects.
5. This unit is not designed for outdoor use.
—
4.3-1
Battery connection cable
—
4.3-2
Rail slide