well as verifying settings by secondary injection. The manual describes the process of
testing an IED in a station which is not in service. The chapters are organized in the
chronological order in which the IED should be commissioned. The relevant
procedures may be followed also during the service and maintenance activities.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for the monitoring, controlling and
setting of the IED. The manual also describes how to identify disturbances and how to
view calculated and measured power grid data to determine the cause of a fault.
The application manual contains application descriptions and setting guidelines
sorted per function. The manual can be used to find out when and for what purpose a
typical protection function can be used. The manual can also provide assistance for
calculating settings.
The technical manual contains operation principle descriptions, and lists function
blocks, logic diagrams, input and output signals, setting parameters and technical
data, sorted per function. The manual can be used as a technical reference during the
engineering phase, installation and commissioning phase, and during normal service.
The communication protocol manual describes the communication protocols
supported by the IED. The manual concentrates on the vendor-specific
implementations.
The point list manual describes the outlook and properties of the data points specific
to the IED. The manual should be used in conjunction with the corresponding
communication protocol manual.
The cyber security deployment guideline describes the process for handling cyber
security when communicating with the IED. Certification, Authorization with role
based access control, and product engineering for cyber security related events are
described and sorted by function. The guideline can be used as a technical reference
during the engineering phase, installation and commissioning phase, and during
normal service.
1.3.2
Document revision history
Document revision/date
History
January 2016
First release
1.3.3
Related documents
Documents related to RET650
Document numbers
Application manual
1MRK 504 158-UEN
Commissioning manual
1MRK 504 160-UEN
Product guide
1MRK 504 161-BEN
Technical manual
1MRK 504 159-UEN
Type test certificate
1MRK 504 161-TEN
1MRK 504 160-UEN -
Section 1
Introduction
Transformer protection RET650 2.1 IEC
9
Commissioning manual
Содержание RET650 2.1 IEC
Страница 1: ...Relion 650 series Transformer protection RET650 2 1 IEC Commissioning manual ...
Страница 2: ......
Страница 24: ...18 ...
Страница 32: ...26 ...
Страница 48: ...42 ...
Страница 52: ...46 ...
Страница 72: ...66 ...
Страница 110: ...104 ...
Страница 116: ...110 ...
Страница 125: ...119 ...