134
Control
Chapter 11
Verifying settings by secondary
injection
Table 20:
Test settings for synchronizing
Parameter
Setting
Operation
Off
UBase
System voltage level
SelPhaseBus1
UL2
SelPhaseBus2
UL2
SelPhaseLine1
UL2
SelPhaseLine2
UL2
PhaseShift
0 degrees
URatio
1.00
CBConfig
SingleBus
AutoEnerg
Off
ManEnerg
Off
ManEnergDBDL
Off
UHighBusEnerg
80% UBase
UHighineEnerg
80% UBase
ULowBusEnerg
30% UBase
ULowLineEnerg
30% UBase
UMaxEnerg
125% UBase
OperationSynch
On
UHighBusSynch
70% UBase
UHighLineSynch
70% UBase
UDiffSynch
15% UBase
FreqDiffMin
0.01 Hz
FreqDiffMax
0.22 Hz
tMaxSynch
600 sec
OperationSC
On
PhaseDiffM
35 degrees
PhaseDiffA
35 degrees
FreqDiffM
0.01 Hz
FreqDiffA
0.01 Hz
UDiff
15% UBase
tAutoEnerg
0.1 s
tManEnerg
0.1 s
ShortPulse
Off
tClosePulse
0.20 s
Содержание RELION REL670
Страница 8: ...Contents ...
Страница 54: ...46 Checking the optical connections Chapter 6 Checking the external optical and electrical connections ...
Страница 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Страница 78: ...70 Downloading settings and configuration from a PC Chapter 10 Configuring the IED and changing settings ...
Страница 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Страница 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Страница 198: ...190 Glossary Chapter 14 Glossary ...