4
Introduction to the installation and
commissioning manual
Chapter 1
Introduction
1.5
Revision notes
Connection diagram, Multi breaker arr. Single phase tripping arr.
1MRK 002 801-EA
Configuration diagram A, Single breaker with single or double busbar
1MRK 004 500-86
Configuration diagram B, Single breaker with singel or double busbar
1MRK 004 500-87
Configuration diagram C, Multi breaker such as 1 1/2 or ring busbar arr.
1MRK 004 500-88
Configuration diagram D, Multi breaker such as 1 1/2 or ring busbar arr.
1MRK 004 500-89
Setting example 1, 400 kV Long overhead power line with 1 1/2 CB arr.
1MRK 506 267-WEN
Setting example 2, 230 kV Extremely long overhead power line, double bus,
single CB arr.
1MRK 506 268-WEN
Setting example 3, 132 kV Short overhead power line, double bus, single CB
arr.
1MRK 506 269-WEN
Connection and Installation components
1MRK 013 003-BEN
Test system, COMBITEST
1MRK 512 001-BEN
PCM600, Protection and Control IED Manager
1MRS755552
Getting started guide
1MRK 500 065-UEN
SPA signal list for IED670
1MRK 500 075-WEN
IEC 61850–8–1 signal list for IED670
1MRK 500 077-WEN
Latest versions of the described documentation can be found on
www.abb.com/substationautomation
Documents related to REL670
Identity number
Revision
Description
-
First release
A
First revision, addition of SPA protocol, LON protocol and IEC 60870-5-103 proto-
col.
Содержание RELION REL670
Страница 8: ...Contents ...
Страница 54: ...46 Checking the optical connections Chapter 6 Checking the external optical and electrical connections ...
Страница 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Страница 78: ...70 Downloading settings and configuration from a PC Chapter 10 Configuring the IED and changing settings ...
Страница 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Страница 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Страница 198: ...190 Glossary Chapter 14 Glossary ...