
9.32
SLD-CONF - Bus zone assignment (2)
GUID-48883315-F0A3-40F6-9B8E-B2BEC1BD7D0B v3
Check Bus zone assignment
After pressing this button, the
software checks whether the bus
zone assignment is completed or
not.
→
The result of the check is
indicated in a separate window.
Note:
For the initial configuration of a standard bus (single-line diagram), the bus zone
assignment is performed completely by the configurator tool.
For complex bus configurations, or for reconfiguration (extension) of existing setfiles,
it might be necessary to
Reassign Buszone
s.
ANSI18000858 V1 EN-US
See
1MRK 511 452-UUS Rev. A
Section 9
Annex B | Configurator mode - System configuration
Distributed busbar protection REB500
81
Engineering manual
© 2020 Hitachi Power Grids. All rights reserved