background image

Table 11:

Start LED (yellow)

LED state

Description

Off

Normal operation.

On

A protection function has started and an indication message is displayed.

The start indication is latching and must be reset via communication,

LHMI or binary input on the LEDGEN component. To open the reset
menu on the LHMI, press 

.

Flashing

The IED is in test mode and protection functions are blocked, or the

IEC61850 protocol is blocking one or more functions.

The indication disappears when the IED is no longer in test mode and

blocking is removed. The blocking of functions through the IEC61850

protocol can be reset in Main menu/Test/Reset IEC61850 Mod. The

yellow LED changes to either On or Off state depending on the state of

operation.

Table 12:

Trip LED (red)

LED state

Description

Off

Normal operation.

On

A protection function has tripped. An indication message is displayed if

the auto-indication feature is enabled in the local HMI.

The trip indication is latching and must be reset via communication, LHMI

or binary input on the LEDGEN component. To open the reset menu on
the LHMI, press 

.

Flasing

Configuration mode.

Alarm indicators

The 15 programmable three-color LEDs are used for alarm indication. An
individual alarm/status signal, connected to any of the LED function blocks, can be
assigned to one of the three LED colors when configuring the IED.

Table 13:

Alarm indications

LED state

Description

Off

Normal operation. All activation signals are off.

On

Follow-S sequence: The activation signal is on.

LatchedColl-S sequence: The activation signal is on, or it is off but the indication

has not been acknowledged.

LatchedAck-F-S sequence: The indication has been acknowledged, but the

activation signal is still on.

LatchedAck-S-F sequence: The activation signal is on, or it is off but the

indication has not been acknowledged.

LatchedReset-S sequence: The activation signal is on, or it is off but the

indication has not been acknowledged.

Flashing

Follow-F sequence: The activation signal is on.

LatchedAck-F-S sequence: The activation signal is on, or it is off but the

indication has not been acknowledged.

LatchedAck-S-F sequence: The indication has been acknowledged, but the

activation signal is still on.

Section 6

1MRK 500 129-UEN A

LHMI overview

32

670/650 series 2.2 IEC

Quick start guide

Содержание Relion 670 series

Страница 1: ...RELION 670 SERIES 670 650 series IEC Version 2 2 Quick start guide...

Страница 2: ......

Страница 3: ...Document ID 1MRK 500 129 UEN Issued June 2018 Revision A Product version 2 2 Copyright 2018 ABB All rights reserved...

Страница 4: ......

Страница 5: ...ocal HMI display 11 Case from the front and rear sides 13 Section 5 Powering up the IED 19 How to know the voltage level 19 How to connect to the power supply 20 Energizing the IED 21 Section 6 LHMI o...

Страница 6: ...Setting up communication between PCM600 and the IED 38 Section 9 Working with the PCM software 43 Table of contents 2 670 650 series 2 2 IEC Quick start guide...

Страница 7: ...guide provides instructions to setup with a preconfigured IED however it is also useful for the customized version of the IED The guide describes basic instructions only For complete information see t...

Страница 8: ...4...

Страница 9: ...v2 Observe the warnings during all types of work related to the product GUID C9B6638A 57E7 4E05 9A33 A60E359C54AF v1 Only electrically skilled persons with the proper authorization and knowledge of an...

Страница 10: ...site configuration This is class 1 equipment that shall be earthed M2367 2 v1 Never disconnect the secondary connection of current transformer circuit without short circuiting the transformer s second...

Страница 11: ...tive wrist strap connected to protective earth when replacing modules Electrostatic discharge ESD may damage the module and IED circuitry M2698 2 v2 Take care to avoid electrical shock during installa...

Страница 12: ...8...

Страница 13: ...information to verify that the received product is correct 3 2 2 Checking delivery items GUID 2A6D8F5A 470F 40D1 9EAE 60DE4DD85EE6 v1 Check that all items are included in the delivery in accordance w...

Страница 14: ...ABB immediately if there are any discrepancies in relation to the delivery documents Section 3 1MRK 500 129 UEN A Unpacking and inspecting 10 670 650 series 2 2 IEC Quick start guide...

Страница 15: ...0 1 v1 4 1 1 Variants of case size with local HMI display M15024 3 v6 IEC04000458 2 en psd IEC04000458 V2 EN US Figure 2 1 2 19 case with local HMI display 1MRK 500 129 UEN A Section 4 IED hardware 67...

Страница 16: ...762 V2 EN US Figure 3 3 4 19 case with local HMI display IEC04000460 2 en psd IEC04000460 V2 EN US Figure 4 1 1 19 case with local HMI display Section 4 1MRK 500 129 UEN A IED hardware 12 670 650 seri...

Страница 17: ...K002801 AC 2 670 1 2 PG V4 EN US Rear position Module X11 PSM X31 and X32 etc to X51 and X52 BIM BOM SOM IOM or MIM X301 X302 X303 X304 SFP X305 LDCM X306 LDCM or OEM X3061 X3062 SFP if OEM is selecte...

Страница 18: ...sition Module X11 PSM X31 and X32 etc to X101 and X102 BIM BOM SOM IOM or MIM X301 X302 X303 X304 SFP X305 LDCM X306 LDCM X3061 X3062 SFP if OEM is selected X311 A B C D SLM X312 LDCM IRIG B GTM X313...

Страница 19: ...Rear position Module X11 PSM X31 and X32 etc to X71 and X72 BIM BOM SOM IOM or MIM X301 X302 X303 X304 SFP X305 LDCM X306 LDCM X3061 X3062 SFP if OEM is selected X311 A B C D SLM X312 LDCM IRIG B GTM...

Страница 20: ...4 EN US Rear position Module X11 PSM X31 and X32 etc to X161 and X162 BIM BOM SOM IOM or MIM X301 X302 X303 X304 SFP X305 LDCM X306 LDCM X3061 X3062 SFP if OEM is selected X311 A B C D SLM X312 LDCM I...

Страница 21: ...1 PSM X31 and X32 etc to X131 and X132 BIM BOM SOM IOM or MIM X301 X302 X303 X304 SFP X305 LDCM X306 LDCM X3061 X3062 SFP if OEM is selected X311 A B C D SLM X312 LDCM IRIG B GTM X313 X322 X323 LDCM I...

Страница 22: ...18...

Страница 23: ...ee the label on the right hand side of the IED to know the voltage level for the IED The label also contains data such as IED serial number and analog input ranges For example see Figure 5 10 9 8 7 7...

Страница 24: ...X11 is a 5 input phoenix type contact See Figure 6 for example IEC08000471 BG V1 EN US Figure 6 Rear view of the 1 2 x 19 IED 1 Connect wires or cables to the IED terminals see Figure 7 for PSM conne...

Страница 25: ...7 876C 4CC3CE706347 v4 Before connecting the auxiliary power check that the terminal strip is wired and placed correctly Remove the protective film from the top side of the unit During IED start up yo...

Страница 26: ...22...

Страница 27: ...0600428 v19 The LHMI keypad contains push buttons which are used to navigate in different views or menus The push buttons are also used to acknowledge alarms reset indications provide help and switch...

Страница 28: ...with object control navigation and command push buttons and RJ 45 communication port 1 5 Function button 6 Close 7 Open 8 Escape 9 Left 10 Down 11 Up 12 Right 13 Key 14 Enter 15 Remote Local 16 Uplink...

Страница 29: ...controlled is selected from the single line diagram Table 6 Object control push buttons Name Description Close Closing the object The LED indicates the current object state Open Opening the object The...

Страница 30: ...electing pages in the SLD Changing the active digit of a parameter when entering a new setting value Key Activating the authorization procedure when the user is not logged in Logging out when the user...

Страница 31: ...F360EA5 v13 The LHMI includes a graphical monochrome liquid crystal display LCD with a resolution of 320 x 240 pixels The character size can vary The amount of characters and rows fitting the view dep...

Страница 32: ...shows the menu content The status area shows the current IED time the user that is currently logged in and the object identification string which is settable via the LHMI or with PCM600 If text pictu...

Страница 33: ...Each function button has a LED indication that can be used as a feedback signal for the function button control action The LED is connected to the required signal with PCM600 IEC13000281 1 en vsd GUI...

Страница 34: ...lor LEDs in one LED group can indicate 45 different signals Altogether 135 signals can be indicated since there are three LED groups The LEDs are lit according to priority with red being the highest a...

Страница 35: ...6 1 en vsd IEC16000076 V1 EN US Figure 13 OPENCLOSE_LED connected to SXCBR 6 1 4 Local HMI functionality 6 1 4 1 Protection and alarm indication GUID 09CCB9F1 9B27 4C12 B253 FBE95EA537F5 v17 Protectio...

Страница 36: ...n the reset menu on the LHMI press Flasing Configuration mode Alarm indicators The 15 programmable three color LEDs are used for alarm indication An individual alarm status signal connected to any of...

Страница 37: ...fferent tasks and functions and control the whole substation PCM600 can operate with many different topologies depending on the customer needs For more information see PCM600 documentation 7 1 1 Conne...

Страница 38: ...d IED Most modern PCs can automatically crossover the straight connection RJ45 cables For example if a Gigabit Ethernet is used in the system a crossover cable is not required If it is unsure whether...

Страница 39: ...J45 cable connection to the front port of the IED The default IP address of the front port of the IED 10 1 150 3 is used to establish a connection 1MRK 500 129 UEN A Section 7 Connecting to the PCM600...

Страница 40: ...36...

Страница 41: ...re shows this concept and the addresses are used as an example other addresses can also be used Subnet Mask for both 255 255 255 0 IEC18000032 1 en vsdx 670 IED IP address Front Port 10 1 150 3 PC IP...

Страница 42: ...LAN WAN network 4 Configure the IED IP addresses in the PCM600 project for each IED to match the IP addresses of the physical IEDs Setting up IP addresses Communication between the IED and PCM600 is e...

Страница 43: ...in between If an IED is equipped with optical LC interface a converter between RJ 45 and LC is needed 1 Select Search programs and files in the Start menu in Windows IEC13000057 1 en vsd IEC13000057...

Страница 44: ...C13000059 1 en vsd IEC13000059 V1 EN US Figure 18 Right click Local Area Connection and select Properties 4 Select the TCP IPv4 protocol from the list of configured components using this connection an...

Страница 45: ...ddress and define IP address and Subnet mask if the front port is used and if the IP address is not set to be obtained automatically by the IED see Figure 20 The IP address must be different from the...

Страница 46: ...must belong to the same subnetwork for this set up to work Setting up the PC to access the IED via a network The same method is used as for connecting to the front port The PC and IED must belong to t...

Страница 47: ...ration and settings from and to the IED After connecting the PCM software and modified network settings the system is ready to connect to the IED To operate with PCM600 there must be at least one IED...

Страница 48: ...44...

Страница 49: ...45...

Страница 50: ...AB Grid Automation Products 721 59 V ster s Sweden Phone 46 0 21 32 50 00 abb com protection control Copyright 2017 ABB All rights reserved Specifications subject to change without notice 1MRK 500 129...