IEC09000724_1_en.vsd
1
Z
3
4
7
5
6
2
a
d
b
c
80%
50%
X
0.5 · RFPP
RLdFw
R
W
/phase
IEC09000724 V1 EN
Figure 9:
Distance protection characteristic with test points for phase-to-phase
measurements
Table 2:
Test points for phase-to-phase loops A-B (Ohm/phase)
Test point
Reach
Set value
Comments
1
X
Z · Sin (LineAng)
R
0
2
X
0
F
RLdFw
When RLdFw < 0,5 * RFPP
R
0,5 * RFPP
When RLdFw > 0,5 * RFPP
3
X
0.8 · Z · Sin (LineAng)
R
0.8 · Z · Cos (LineAng) + RFPP/2
4
X
0.8 · Z · Sin (LineAng)
Can be limited by 0,5 * RFPP setting
R
-0.8 · Z · Sin (LineAng) ·
tan (ArgNegRes-90)
5
X
0.5 · RFPP · tan (ArgLd)
Only when RLdFw < 0,5 * RFPP
R
0.5 · RFPP
6
X
-0.5 RLdFw · tan (ArgDir)
R
0.5 · RLdFw
7
X
0.5 · Z · Sin (LineAng)
Time measurement
R
0
is used in conjunction with figure
.
1MRK 506 331-UUS A
Section 6
Testing functionality
47
Commissioning Manual
Содержание Relion 650 Series REL650
Страница 1: ...Relion 650 series Line distance protection REL650 ANSI Commissioning Manual ...
Страница 2: ......
Страница 8: ......
Страница 22: ...14 ...
Страница 44: ...36 ...
Страница 52: ...44 ...
Страница 156: ...148 ...
Страница 166: ...158 ...
Страница 175: ...167 ...