Figure 7:

Testing mA output by connecting multimeter directly to

connector and measuring output current by multimeter

Check the status of the output circuits driving the mA outputs via the LHMI.
Select 

Main menu/Monitoring/I/O status/mA output modules/RTD3

 and

check the output status and value for the channel under inspection.

Test and change the output manually.
1.

Select 

Main menu/Test/IED test mode/TestMode

 and set the parameter

to “On”.

2.

Select 

Main menu/Tests/Forcing/Analog output values/RTD3

.

3.

Select the AOn to be forced.

4.

Force the actual output using 

 and 

 or 

.

Each AOn is represented by two signals. The first signal in LHMI is the actual
primary value of the output. The second signal is the status Normal or Forced.
Forced status is only achieved when the AO is set to “Forced” on the LHMI.

When forcing analog output signals the scaling defined by analog
output channel configuration is not used. Fixed scaling factor
1000:1 is used instead. This means that forcing value 5.000 A is
seen as 5 mA when measured from output.

Do not force or send values to disconnected channels. This results
in an out-of-range error.

Forcing feature can be tested only for configured output channels.
When mA current values are forced to non-configured output
channels, values are not passed to mA output channel HW
circuitry.

Section 5

1MRS756801 E

Troubleshooting

40

630 series

Commissioning Manual

Содержание Relion 630 Series

Страница 1: ...RELION PROTECTION AND CONTROL 630 series Commissioning Manual...

Страница 2: ......

Страница 3: ...Document ID 1MRS756801 Issued 2019 02 25 Revision E Product version 1 3 Copyright 2019 ABB All rights reserved...

Страница 4: ...bed in this document is furnished under a license and may be used copied or disclosed only in accordance with the terms of such license Trademarks ABB and Relion are registered trademarks of the ABB G...

Страница 5: ...ted and communicate data and information via a network interface which should be connected to a secure network It is the sole responsibility of the person or entity responsible for network administrat...

Страница 6: ...rning electrical equipment for use within specified voltage limits Low voltage directive 2006 95 EC This conformity is the result of tests conducted by ABB in accordance with the product standards EN...

Страница 7: ...d to carry out the electrical installation National and local electrical safety regulations must always be followed The frame of the protection relay has to be carefully earthed The protection relay c...

Страница 8: ......

Страница 9: ...between PCM600 and the IED 13 Writing an application configuration to the IED 14 Checking CT circuits 15 Checking VT circuits 16 Checking the RTXP test switch 16 Checking transducer circuits 17 Checki...

Страница 10: ...s 29 Identifying runtime errors 29 Identifying communication errors 29 Checking the communication link operation 30 Checking the time synchronization 30 Running the display test 31 Indication messages...

Страница 11: ...testing a relay in a substation which is not in service The chapters are organized in the chronological order in which the relay should be commissioned 1 2 Intended audience This manual addresses the...

Страница 12: ...2B02C V1 EN Figure 1 The intended use of documents during the product life cycle Product series and product specific manuals can be downloaded from the ABB Web site http www abb com relion 1 3 2 Docum...

Страница 13: ...d in the text It might indicate the presence of a hazard which could result in corruption of software or damage to equipment or property The information icon alerts the reader of important facts and c...

Страница 14: ...for a function indicates that the signal must be connected to another function block in the application configuration to achieve a valid application configuration 1 4 3 Functions codes and symbols Ta...

Страница 15: ...EFPDIF dI0Hi 87NH Rotor earth fault protection MREFPTOC Io R 64R Phase discontinuity protection PDNSPTOC I2 I1 46PD Negative sequence overcurrent protection NSPTOC I2 46 Negative sequence overcurrent...

Страница 16: ...1U Load shedding LSHDPFRQ UFLS R 81LSH Low voltage ride through protection function LVRTPTUV U RT 27RT Overexcitation protection OEPVPH U f 24 Voltage vector shift protection VVSPPAM VS 78V Three phas...

Страница 17: ...ter for machines and devices MDSOPT OPTS OPTM Circuit breaker condition monitoring SSCBR CBCM CBCM Fuse failure supervision SEQRFUF FUSEF 60 Current circuit supervision CCRDIF MCS 3I MCS 3I Trip circu...

Страница 18: ...g channels 1 10 samples A1RADR ACH1 ACH1 Analog channels 11 20 samples A2RADR ACH2 ACH2 Analog channels 21 30 calc val A3RADR ACH3 ACH3 Analog channels 31 40 calc val A4RADR ACH4 ACH4 Binary channels...

Страница 19: ...ation Site acceptance testing SAT or commissioning testing is typically done to verify that the installed IED is correctly set and connected to the power system SAT requires that the acceptance testin...

Страница 20: ...power supply of the IED to start it up This can be done in a number of ways from energizing a whole cubicle to energizing a single IED Set the IED time if no time synchronization source is configured...

Страница 21: ...IP address must be configured in both cases to enable communication The communication procedures are the same in both cases 1 If needed set the IP address for the IEDs 2 Set up the PC or workstation f...

Страница 22: ...is correctly established The default IP address of the front port is 192 168 0 254 Use Ethernet crossover cables only for point to point connections Modern network adapters contain logic for automati...

Страница 23: ...ation of the directional function protection or measurement in the protection relay CT secondary loop resistance measurement to confirm that the current transformer secondary loop DC resistance is wit...

Страница 24: ...RTXP test switch The RTXP test switch is designed to provide the means of safe testing of the IED This is achieved by the electromechanical design of the test switch and test plug handle When the tes...

Страница 25: ...pecified values from the instrument transducer manufacturer 2 11 Checking binary input and output circuits 2 11 1 Checking binary input circuits Preferably disconnect the binary input connector from t...

Страница 26: ...ment PT and NI sensors 25 CU10 sensor 2 5 Resistance measurement 25 Accuracy PT and NI sensors 1 C for measuring range 40 C 200 C and 5 C for measuring range 40 C 100 C CU10 sensor 4 C for measuring r...

Страница 27: ...utput to inputs and output to protective earth 2 13 Checking optical connections Check that the Tx and Rx optical connections are correct A relay equipped with optical connections requires a minimum d...

Страница 28: ...20...

Страница 29: ...ration Communication IEC 61850 GOOSE receive functions are disabled by default Set the parameter Operation to On or Off in Main menu Configuration Communication 1 IEC61850 8 1 GOOSE 3 2 Verifying the...

Страница 30: ...22...

Страница 31: ...isturbance report settings to ensure that the indications are correct For test functions and test and signal parameter names see the technical manual The correct initiation of the disturbance recorder...

Страница 32: ...prevent the flash memory from wearing out due to too many writings caused by the application configuration As a consequence saving application function states may take up to an hour If the auxiliary...

Страница 33: ...lf withdrawn position In this position all voltages and currents are restored and any re energizing transients are given a chance to decay before the trip circuits are restored When the latches are re...

Страница 34: ...is active which depends on the configuration Ensure that the logical status of the BLOCK input signal is equal to 0 for the function to be tested Event function blocks can also be individually blocked...

Страница 35: ...active and apparent power power factor phase angles as well as positive and negative sequence currents and voltages are available in the local HMI under Main menu Monitoring I O status Monitoring Navi...

Страница 36: ...erify alarm and blocking signals 3 Use the disturbance handling tool in PCM600 to evaluate that the protection function has received the correct data and responded correctly signaling and timing 4 Use...

Страница 37: ...th an external test device If the problem remains contact ABB for repair or replacement actions 5 1 2 Identifying runtime errors 1 Check the error origin from IED s internal event list Main menu Monit...

Страница 38: ...Check that the LINKUP value is 1 that is the communication is working When the value is 0 there is no communication link 2 Check the communication status of the rear port X0 via the LHMI in Main menu...

Страница 39: ...s not updated dynamically The list is updated by leaving the Internal events menu and then selecting it again The current status of the internal fault signals can also be checked via the LHMI in Main...

Страница 40: ...occurred The instance number is displayed at the end of the fault indication Internal Fault RTD Error An RTD card error has occurred The instance number is displayed at the end of the fault indication...

Страница 41: ...ng properly the configuration can be restored to the original factory state All default settings and configuration files stored in the factory are restored For further information on restoring factory...

Страница 42: ...current input Check the actual state of the connected binary inputs In LHMI select Main menu Monitoring I O status Binary input modules Then navigate to the board with the actual binary input to be ch...

Страница 43: ...4711 A71D BBC76B60BA3D V1 EN Figure 2 Testing output contacts using the voltage drop method 1 Contact current 2 Contact voltage drop 3 Load 4 Supply voltage 1MRS756801 E Section 5 Troubleshooting 630...

Страница 44: ...set the IED to test mode select Main menu Test IED test mode TestMode and set the parameter to On 2 To operate or force the output relay to operate select Main menu Test Forcing Binary output values a...

Страница 45: ...s reduced quickly by the electrical cleaning effect of fritting and thermal destruction of layers bringing the contact resistance back to the mOhm range As a result practically the full voltage is ava...

Страница 46: ...an example of a 4U case See the technical manual for complete terminal diagrams GUID 327C519C BA13 4161 A62C B94074ECEC01 V1 EN Figure 4 Testing sensor resistance input by connecting resistor directl...

Страница 47: ...9273 AA9BD6ED7F6E V1 EN Figure 6 Testing current input by connecting voltage source directly to connector and measuring input current by multimeter Current type measurement mode can be verified by con...

Страница 48: ...or Each AOn is represented by two signals The first signal in LHMI is the actual primary value of the output The second signal is the status Normal or Forced Forced status is only achieved when the AO...

Страница 49: ...t the parameter TestMode to Off after completing the tests The Start LED stops flashing when the relay is no longer in test mode 1MRS756801 E Section 5 Troubleshooting 630 series 41 Commissioning Manu...

Страница 50: ...42...

Страница 51: ...omputer networking technologies into a LAN FAT Factory acceptance testing HMI Human machine interface HW Hardware I O Input output IEC International Electrotechnical Commission IED Intelligent electro...

Страница 52: ...er RJ 45 Galvanic connector type RTD Resistance temperature detector Rx Receive Received SAT Site acceptance testing TCP IP Transmission Control Protocol Internet Protocol Tx Transmit Transmitted VT V...

Страница 53: ...45...

Страница 54: ......

Страница 55: ......

Страница 56: ...BB Distribution Solutions Distribution Automation P O Box 699 FI 65101 VAASA Finland Phone 358 10 22 11 www abb com mediumvoltage www abb com relion Copyright 2019 ABB All rights reserved 1MRS756801 E...

Отзывы: