
76
Verifying the communication
Chapter 11
Establishing connection and
verifying the
2
Verifying the communication
To verify that the rear communication with the SMS/SCS system is working, there are some dif-
ferent methods. Choose one of the following.
2.1
Verifying SPA communication
Procedure
1.
Use a SPA-emulator and send “RF” to the terminal. The answer from
the terminal should be “REx500 25”.
2.
Generate one binary event by activating a function which is config-
ured to an event block where the used input is set to generate events
on SPA. The configuration must be made with the CAP5xx software.
Verify that the event is presented in the SMS/SCS system.
During the following tests of the different functions in the terminal, verify that the events and
indications in the SMS/SCS system are as expected.
2.2
Verifying IEC communication
To verify that the IEC communication with the IEC master system is working, there are some
different methods. Choose one of the following.
Procedure
1.
Check that the master system time-out for response from the termi-
nal, for example after a setting change, is > 40 seconds.
2.
Use a protocol analyzer and record the communication between the
terminal and the IEC master. Check in the protocol analyzer’s log
that the terminal answers the master messages.
3.
Generate one binary event by activating a function which is config-
ured to an event block where the used input is set to generate events
on IEC. The configuration must be made with the CAP5xx software.
Verify that the event is presented in the IEC master system.
During the following tests of the different functions in the terminal, verify that the events and
indications in the IEC master system are as expected.
Содержание REB 551-C3*2.5
Страница 9: ...Contents ...
Страница 21: ...12 Introduction to the installation and commissioning manual Chapter 1 Introduction ...
Страница 27: ...18 Note signs Chapter 2 Safety information ...
Страница 53: ...44 Installing the 56 64 kbit data communication cables Chapter 5 Installing the terminal ...
Страница 59: ...50 Checking the binary I O circuits Chapter 6 Checking the external circuitry ...
Страница 79: ...70 Downloading settings and configuration from a PC Chapter 9 Setting and configuring the terminal ...
Страница 135: ...126 Testing the interaction of the distance protection Chapter 14 Verifying the internal configuration ...
Страница 139: ...130 Testing the interaction of the distance protection Chapter 15 Testing the protection system ...
Страница 147: ...138 Repair support Chapter 16 Fault tracing and repair ...