Operation Manual / Power2 850-M / High-pressure stage
6 Operation and service / 6.2 Service work
© Copyright 2022 ABB. All rights reserved.
HZTL4063_EN
Rev.F
March 2022
6.2.4
Service work every 12000 ... 16000 hours of operation
The rotor and bearing parts must be checked and assessed by a Turbo Systems service sta-
tion.
u
Dismantle low-pressure and high-pressure stage. Measure clearances.
u
Clean nozzle ring and casing and check for cracks and erosion/corrosion.
Additional measures in conjunction with the high-pressure stage:
u
Replace gaskets every time after disassembly.
u
Check bellows between air-inlet casing and compressor casing for cracks and clean (see
also chapter Cleaning the HP bellows (if present)).
6.2.5
Service work according to specifications on the rating
plate
The following work must be carried out by a Turbo Systems service station:
¡
Replacement of the bearing parts
¡
Replacement of the turbine and the compressor.
6.2.6
Entries in the engine logbook
The monitoring of the engine enables conclusions to be drawn on the behaviour of the low-
pressure and high-pressure stage.
The following operating data and measured values must be entered regularly in the engine
logbook of the enginebuilder:
¡
Performance and speed of the engine
¡
Air intake temperature
¡
Pressure of the charge air
¡
Pressure loss in the charge air cooler and intercooler
¡
Lubricating oil pressure and lubricating oil temperature
If present:
¡
Speed of low-pressure and high-pressure stage
¡
Air temperature before and after the compressor and after the charge air cooler
¡
Exhaust gas temperature before and after the turbine
¡
Atmospheric humidity of the suction air (before the low-pressure stage)
Page
47
/
104
Содержание PT004165
Страница 2: ......