Placing the high-pressure stage on the bracket
Fig. 17: Preparing the fastening elements of the high-pressure stage
1. Insert expansion bush (42190) into bearing casing.
2. Screw the clamping nut (42201) flush onto the threaded rod (42191). The hexagon of the
thread screw is at the top.
3. Place thrust washer (01) of clamping nut onto expansion bush.
4. Lead threaded rod (42191) with screwed-on clamping nut through thrust washer, expan-
sion bush and bearing casing.
5. Screw the centering bush (42193) flush onto the threaded rod from below.