![ABB Powernet 6920U-102-500 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/abb/powernet-6920u-102-500/powernet-6920u-102-500_manual_3638786025.webp)
GB
Start-up
The function of device
6920 U-102-500
is software-
dependent. For programming, connect a PC to the Powernet
EIB bus line by means of the ETS 2, from Version 1.1
onwards or Power-Project (min. Vers. 3.0)by means of the
interface EIB-RS 232.
Allocation of the Physical Address
• Switch on the supply voltage.
• Press the programming button
(Fig. 1, Pos. 8)
on built-in
device
6920 U-102-500.
The red programming LED
(Fig. 1, Pos. 9)
illuminates.
• The red LED extinguishes after the physical address has
been programmed.
• Note the number of the physical address on device, if
appropriate, using a non-smudge pen.
Selection/Parameterization of the Application
Please refer to the current Technical Manual for a description
of the available applications/versions and appurtenant para-
meters.
Содержание Powernet 6920U-102-500
Страница 3: ...D Fig 2 L N L N Achtung Die mittlere Klemme darf nicht verwendet werden ...
Страница 8: ...D Montage D 1 ...
Страница 11: ...Fig 2 L N L N Attention La borne du milieu ne doit pas etre utilisée F ...
Страница 16: ... Montage F 1 ...
Страница 19: ...Fig 2 L N L N Caution The center terminal is not to be used GB ...
Страница 24: ...D Installation GB 1 ...
Страница 27: ...Fig 2 L N L N Opgelet De middelste klem mag niet worden gebruikt NL ...
Страница 32: ... Montage NL 1 ...
Страница 35: ...ESP Fig 2 L N L N Atención No se puede usar el borne central ...
Страница 40: ... Montaje ESP 1 ...
Страница 43: ...I Fig 2 L N L N Attenzione Il morsetto centrale non deve essere usato ...
Страница 48: ... Montaggio I 1 ...
Страница 51: ...S Fig 2 L N L N OBS Mittklämman far inte användas ...
Страница 56: ... Montering S 1 ...