Step 10    Adjust Voltage at Power Source 

To allow for maximum distance between the NGC and the power source, 

adjust the no-load output at the power source to 14.5 to 15 VDC for 12 

Volt systems and approximately 25 VDC for 24 Volt systems. This 

assumes one of the below wire sizes is used, and the optional auxiliary 

heater is not used. The maximum wire size is 12 AWG (2.5MM

2

). 

Temporarily disconnect power prior to beginning the next step. 

 

12 Volt System 

24 Volt System 

 

Wire 

Max. Length 

(Ft) 

Max Length 

(M) 

Max. Length 

(Ft) 

Max Length 

(M) 

12 AWG 

296’ 

90 M 

511’ 

155 M 

14 

AWG 

185’ 56 

M 320’ 97 

2.5 mm

2

 

224’ 68 

M 387’ 117 

1.5 mm

2

 

137’ 41 

M 237’ 75 

NOTE: 

It is strongly recommended that 12 or 14 AWG wire be used to 

avoid power problems. 

Step 11 

 

Apply DC Power to the Termination Board J1 Terminal, 
and Check Voltage 

Remove the J1 terminal from the NGC termination board, and field wire 

power (+) to pin 1 and power (-) to pin 2. Reinstall the J1 terminal on the 

termination board. Apply power to the unit. The oven will begin heating 

and will provide maximum load conditions. Due to the fast pulsing action 

of the oven circuit, the true voltage cannot be read with a traditional 

voltmeter. However, using a voltmeter, the user needs to verify that they 

can read a minimum of 11.5 VDC at J1 on the NGC termination board for 

12 Volt systems or a minimum of 25 VDC at J1 for 24 Volt systems. 

Voltages must 

NEVER

 drop below 10.5 VDC on the 12 Volt system or 21 

VDC on the 24 Volt system.  

Maximum instantaneous current for a 12 Volt system should be between 

4 Amps (no auxiliary heater) and 8.2 Amps (with auxiliary heater). 

Maximum instantaneous current for a 24 Volt system should be between 

2.2 Amps (no auxiliary heater) and 5.2 Amps (with auxiliary heater). 

Maximum instantaneous current is usually experienced at start-up. 

Start-Up 

Step 12    Install the PCCU32 Software Provided on CD 

 12A 

  Insert the PCCU32 disk into the laptop’s CD drive. The 

installation process should begin automatically. If not, click the 
Start button, and select Run. In the Run dialog box, type: 
D:\Disk1\setup.exe

 

(D being the CD drive designation).Follow 

the screen prompts. The user needs to enter their name, 
company, destination folder (PCCU_NGC recommended) and 
program folder. 

Start-up 

Содержание NGC8206

Страница 1: ...MEASUREMENT CONTROL SYSTEMS NGC8206 Start Up Guide...

Страница 2: ...llations only It is recommended that inexperienced technicians consult the Totalflow NGC8206 User s Manual for more detailed information while performing the installation and start up Scan through the...

Страница 3: ...0 15 20 m 2102024 XXX 16 100 30 48 m 2102024 XXX 23 150 45 72 m 2102024 XXX 30 200 60 10 m 2102024 XXX 36 250 76 20 m 2102024 XXX 42 300 91 44 m 2102024 XXX 50 350 106 68 m 2102024 XXX 56 380 115 82 m...

Страница 4: ...ORTANT A particulate filter with a liquid vapor separator sample conditioning module is strongly recommended Operating the NGC without a sample conditioning module can allow liquids and particulates t...

Страница 5: ...Strouhal number to determine probe lengths This reduces the effects of resonant vibration Please refer to API standards for additional information Step 5 Connect Sample Streams IMPORTANT Remove sealin...

Страница 6: ...of the NGC8206 User s Manual If a sample conditioning module is not being used the sample transport tubing should be 1 16 inch tubing and no longer than ten feet Purge all lines prior to connecting t...

Страница 7: ...input 1 DI1 and the calibration blend bottle to digital input 2 DI2 See the termination board drawing on page 15 Step 7 Set Carrier Regulator to 90 PSIG Cal Blend and Sample Probe Regulators to 15 PS...

Страница 8: ...and will provide maximum load conditions Due to the fast pulsing action of the oven circuit the true voltage cannot be read with a traditional voltmeter However using a voltmeter the user needs to ve...

Страница 9: ...This is the outside connector on the NGC with an explosion proof cap Use Serial Port If using the serial port the external connection on the NGC is a round military type connector Keep Current Port I...

Страница 10: ...he NGC should have defaulted to 0000 on start up Step 15 NGC Start Up Wizard When PCCU establishes a connection with the NGC the NGC Start Up Wizard begins automatically This will only happen the firs...

Страница 11: ...ormation Be sure to put the unit in Run mode as instructed and allow the unit to run anywhere from eight 8 hours to overnight Step 16 Calibrate the NGC After the unit has run for a minimum of eight 8...

Страница 12: ...l indicator of the flowing calibration stream will display The Next Mode should still indicate Hold and the unit will go back into Hold mode when the calibration process is finished If using 2 Purge c...

Страница 13: ...n process that was just run This signifies that the calibration data was accepted no alarms etc If this displays an older date and time generally indicating factory calibration the new calibration dat...

Страница 14: ...ed during the Start Up Wizard the user may want to see if the streams they set to run automatically are For a stream to automatically sequence it must be enabled and be present in the stream sequence...

Страница 15: ...ration the unit will return to its normal stream sequence NOTE Allow at least the first stream to complete and verify that the Unnormalized total is 100 5 99 5 100 5 This concludes setting up the NGC...

Страница 16: ...d CTS No Connection Receive Bus COMM 2 J10 COMM 2 J10 COMM 2 J10 1 Power Out Power Out Power Out 2 Ground Ground Ground 3 Switched Power Out Switched Power Out Switched Power Out 4 Operate Operate Ope...

Страница 17: ...urity code and the listen cycle time match in WinCCU and PCCU Verify the wiring from the NGC8206 to the Optional Equipment Unit OEU terminal strip and then the terminal strip to the radio Verify the c...

Страница 18: ...e fine tuning To use either Peak Find function the user must first place the unit in Hold Once in Hold select Peak Find from the Analyzer Operation screen Please notice that the Manual check box is gr...

Страница 19: ...able to check the Manual box There is now a Peak Setup table and the various parameter fields can be modified There are areas in the Peak Setup table such as Slope Run Slope Rise and Front Height Rat...

Страница 20: ...peak Possibility Front Height Ratio may need refined See Integrating Peaks Gates may need to be added See Gating Peaks Clue Chrom 2 C2 peak time is not eluting around 220 seconds Possibility Column 2...

Страница 21: ...pproximately 220 seconds the unit performs optimally This is not to say that there may be special applications which can cause these times to be different If nC5 and C2 are not within 3 4 seconds of t...

Страница 22: ...the peaks Manually label the peaks in the Peak Find screen by zooming in on the chrom placing the cursor inside of the peak right clicking and selecting Label Peak When the new window displays select...

Страница 23: ...On the Analyzer Operation screen click the Stream Sequence tab Under the Stream Enable section set the value next to the corrsponding stream to Disable Remove unused streams from the Stream Sequence...

Страница 24: ...ABB Inc Totalflow Products 7051 Industrial Blvd Bartlesville Oklahoma 74006 Tel USA 800 442 3097 International 001 918 338 4880...

Отзывы: