ABB Navigator 550 Sodium wet-section Скачать руководство пользователя страница 3

4 Replacement procedures

 

Navigator 550 | Sodium wet-section | Spares replacement procedures | 

INF13/115–EN Rev. B

3

4.1 Replacing the PCB housing seals, PCB cover and PCB

Part numbers:

PCB housing seals: AW501 051

PCB cover: AW501 052

PCB: AW501 050

Referring to Fig. 4.2:

1. Remove and retain the 4 PCB cover fixing screws and

washers 

A

 and remove the PCB cover 

B

.

2. If replacing PCB housing seals, remove and discard housing

seal 

C

.

3. Disconnect all cables from the PCB 

D

, loosen all cable

glands and remove cables.

4. Remove and retain the 4 PCB housing fixing screws and

washers 

E

 and remove the PCB housing 

F

.

5. If replacing PCB housing seals, lift PCB housing seal 

G

 out

of the groove and discard.

6. Remove and retain the 2 PCB fixing screws and washers 

H

and remove the PCB 

D

. If replacing PCB housing seals, fit

the new (large) PCB housing seal 

G

 in the groove (a small

amount of silicone sealant or grease can be used to help
retain the seal in place).

7. Fit the new PCB to the rear of the main case using the 2 PCB

retaining screws and washers 

H

.

8. Refit the PCB housing 

E

 using the 4 PCB housing fixing

screws and washers 

D

.

Referring to Fig. 4.3 and Table 4.1 for terminal connection details:

9. Make cable connections at the new PCB.

Referring to Fig. 4.2:

10. If replacing PCB housing seals, fit the new (small) PCB

housing seal 

C

 between the PCB cover 

B

 and PCB

housing 

F

 (a small amount of silicone sealant or grease can

be used to help retain the seal in place).

11. Refit the PCB cover 

B

 using the 4 PCB cover fixing screws

and washers 

A

, ensuring PCB housing seal 

C

 is located

correctly in its groove.

4.2 Replacing the flowmeter assembly and flowmeter cable(s)

Part numbers:

Flowmeter: AW501 068

Single-stream cable: AW501 086

Multi-stream cable: AW501 087

Referring to Fig. 4.4:

1. Disconnect the flowmeter cable 

A

 from the flowmeter 

B

and remove the sample inlet tubing 

C

 from the flowmeter

inlet spigot 

D

. If replacing cable(s), refer to Section 4.1 for

cable disconnection details and remove / discard the cable(s).

2. Disconnect the flowmeter 

B

 from the QD connector 

E

 by

pressing the ring and pulling the flowmeter away.

3. Fit new flowmeter(s) / cable(s) in the reverse order of removal

– ensure the correct cable type (multi-stream or
single-stream) is connected at each flowmeter.

Fig. 4.2 Replacing the PCB housing seals, PCB cover and PCB

Fig. 4.3 Wet section PCB cable entries – see Table 3.1 for connections

B R 

SC R

G W

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35

2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

2

3

4

5

6

7

8

1

Addi

ti

o

n

al da

is

y -c

hain 

cab

le connections

Entry

Cable

Color

Terminal Description

1

Serial (Modbus) – refer to 
Operating Instructions

(OI/ASO550-EN) 

for multiple wet-section setup

Red
Black
Green
White
Screen

R
B

G

W

SCR

24 V
0 V
Data +ve
Data –ve
Screen

2

Sodium electrode

Screen
Core

34
36

N/A

3

Pt1000 temperature sensor

Red
Blue

33
35

N/A

4

Reference electrode

Black

32

N/A

5

Pressure switch

Red
Black

25
26

N/A
N/A

6

Calibration valve

Green
Brown
Red
Black
Yellow
Orange

7
8
9

10
11
12

Valve 1 +ve
Valve 1 –ve
Valve 2 +ve
Valve 2 –ve
Regen. +ve
Regen. –ve

7

Stream switch valve – 
single-stream

Red
Black

Green
Brown
Red
Black
Yellow
Orange

1
2

1
2
3
4
5
6

Valve 1 +ve
Valve 1 –ve

Valve 1 +ve
Valve 1 –ve
Valve 2 +ve
Valve 2 –ve
Valve 3 +ve
Valve 3 –ve

Stream switch valve – 
multi-stream

8

Flowmeter – stream 1

Red
Brown
Black

13
15
17

+ve
GND
–ve

Flowmeter – stream 2 
(multi-stream)

Orange
Yellow
Green

20
22
24

+ve
GND
–ve

Flowmeter – stream 3 
(multi-stream)

Blue
Violet
Grey

19
21
23

+ve
GND
–ve

Table 4.1 Wet-section cable terminal connections

Fig. 4.4 Replacing the flowmeter assembly and flowmeter cable(s)

Содержание Navigator 550 Sodium wet-section

Страница 1: ...nt made easy 1 Introduction These procedures must be carried out by a trained technician Tools required Pozidrive screwdriver Slot head terminal screwdriver Anti static strap 2 For more information Further information is available from www abb com analytical or by scanning these codes Sales Service Navigator 550 sodium wet section ...

Страница 2: ...e supplies to the transmitter before performing replacement procedures The wet section is vulnerable to electrostatic damage Wear an anti static strap or dismantle the wet section on an anti static workbench Ensure all electrical connections are kept dry at all times GENERAL Shut off the external sample supply to the wet section before performing replacement procedures When a procedure is complete...

Страница 3: ... cable AW501 086 Multi stream cable AW501 087 Referring to Fig 4 4 1 Disconnect the flowmeter cable A from the flowmeter B and remove the sample inlet tubing C from the flowmeter inlet spigot D If replacing cable s refer to Section 4 1 for cable disconnection details and remove discard the cable s 2 Disconnect the flowmeter B from the QD connector E by pressing the ring and pulling the flowmeter a...

Страница 4: ...ve AW501 053 Cable for multi stream solenoid valve AW501 081 Sodium single stream solenoid valve AW501 077 Cable for single stream solenoid valve AW501 080 Cable for calibration and reagent solenoid valve AW501 082 Referring to Fig 4 6 1 Remove all tubing connected to the valves A 2 Unclip the valve cable connectors B from the underside of each solenoid valve body If replacing cable s refer to Sec...

Страница 5: ...nd A at the wet section PCB housing B and disconnect the Modbus cable D from the terminal block connections C marked black red screen green and white 3 Withdraw the Modbus cable D from the PCB housing and main case assembly and discard 4 Feed the replacement Modbus cable into the main case via the guide channel E at the top feed through the gland and remake connections to the black red screen gree...

Страница 6: ...Notes 6 INF13 115 EN Rev B Navigator 550 Sodium wet section Spares replacement procedures Notes ...

Страница 7: ...Notes Navigator 550 Sodium wet section Spares replacement procedures INF13 115 EN Rev B 7 ...

Страница 8: ... rights in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB ABB 2018 ABB Limited Measurement Analytics Oldends Lane Stonehouse Gloucestershire GL10 3TA UK Tel 44 0 1453 826661 Fax 44 0 1453 829671 Email instrumentation gb abb ...

Отзывы: