
4 |
2105515-001 rev. AB
2 Upgrade kit overview
2.1
Upgrade kit contents
Two different
µ
FLO
G5
upgrade kits are available:
—
µ
FLO
G4
to
µ
FLO
G5
flow computer upgrade kit
—
µ
FLO (G3) to
µ
FLO
G5
flow computer upgrade kit
Both upgrade kits include the following items:
— G5 IMV complete assembly
—
µ
FLO
G5
board layout label (Part no. 2104412-002)
—
µ
FLO
G5
product identification label (Part no. 2103226-002)
—
µ
FLO
G5
Startup guide (Part no. 2105513-001)
— TLF device operator software products DVD (Part no. 2104410-022 or later)
Additionally, the
µ
FLO (G3) to
µ
FLO
G5
upgrade kit includes:
— PCCU cable (Part no. 2104400-001)
The G5 IMV consists of the sensor assembly and comes preprogrammed with the
latest version of the standard FLASH software and the standard configuration file. If
a different FLASH or configuration file is required, contact the ABB Main office at the
number listed on the back of this guide.
IMPORTANT NOTE:
The G5 IMV is available with the high pressure
port on the left or right, and in carbon steel and stainless steel
configurations.
In this guide, section 3.8,
MMI cable replacement (G3 to G5 conversion only)
,
beginning on page 12, is only applicable for the G3 to G5 upgrade. Please skip that
section for G4 to G5 upgrades. All remaining sections are applicable to both kits.
2.2
Requisite tools and materials
The following items are necessary to perform the upgrade:
— Phillips
screwdriver
— Small slotted screwdriver
— 1/4 inch hex driver
— 1/2 inch socket with ratchet
— 7/8 inch open end wrench
— Clean dry cloth
Содержание mFLOG5
Страница 15: ......