ABB-Welcome
Operation
|
— 27 —
Fig. 14
Addressing
No.
Functions
1
3-> OFF, 4-> ON
2
Call the guard unit. If there are multiple guard units in the same section, all
guard units will ring at the same time when a visitor presses the button
“call guard unit”.
3
Call apartment 01
4
Call apartment 02
Fig. 15
Addressing
No.
Functions
3
4
DIP
1
2
1
2
3
4
001
002
Guard unit
3
4
DIP
1
1
2
3
4
001
Guard unit
Содержание M25102xC Series
Страница 9: ...ABB Welcome Terminal description 9 4 1 1 Lock connected with terminals 3 4 ...
Страница 10: ...ABB Welcome Terminal description 10 4 2 Camera module Fig 3 Terminal description ...
Страница 13: ...ABB Welcome Terminal description 13 ...
Страница 15: ...ABB Welcome Terminal description 15 ...
Страница 59: ...ABB Welcome Mounting Installation 59 Cover frame ...
Страница 60: ...ABB Welcome Mounting Installation 60 Flush mounted box ...
Страница 61: ...ABB Welcome Mounting Installation 61 Rain hood ...