![ABB J2013001 Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/abb/j2013001/j2013001_quick-start-manual_3045478001.webp)
QUICK START GUIDE
Page 1
© 2021 ABB. All rights reserved.
1U Stackable Distribution Shelf
-
19 in Rack
Mount
J2013001
-
multiple models
-
See SPS, CP, or NE Brochure for models.
Distribution shelves may be bused together as shown above in SPS, CP, and NE systems or used as stand
-
alone
remote distribution (cabled to a power system).
Primary distribution shelves include battery connections. Some models also include battery contactors.
Install the primary distribution shelf immediately above the primary SPS, CP, or NE rectifier shelf (with controller).
Communication cables and interconnecting hardware are included.
Refer to SPS, CP, or NE
-
S Power System Brochure for details and accessories.
Tools required:
Step 1
-
Mount Shelf
1.
Reposition mounting ears as required
-
4 screws each. Torque to 25 in
lb (2.8Nm)
-
Phillips screwdriver.
2.
Position the Initial Panel immediately above the rectifier shelf with
Controller. Position Supplementary Panels immediately above
another
Panel.
3.
Install Inter
-
Shelf brackets between adjacent shelves (optional). Torque
to 25 in
-
lb (2.8Nm)
-
Phillips
screwdriver.
4.
Attach shelf to the frame using a minimum of four screws (two on each
side)
-
12
-
24 (provided).
Torque to 35 in
-
lb (4Nm)
-
5/16”
socket.
Supplementary
Distribution Shelves
Primary Distribution
Shelf
Battery
Connection
options
SPS System Example
•
Torque wrench (0
-
65 in
-
lb or 0
-
10Nm)
•
Sockets
-
5/16”, 7/16”
•
Screw Drivers (#1 Phillips)
•
Wire cutters and strippers
•
Cable crimpers
Inter
-
Shelf Bracket
Mounting Ears
2 Adjacent Shelves
{
Rectifier Shelves